Biomark Submersible Battery Assembly & Installation Download Page 4

 

 

 

 

 

 

 

 

 

 

SUBMERSIBLE BATTERY INSTALLATION 

 

QUICK START GUIDE 

 

Step 4: Install Bus Bars & BMS Wiring for 12 Volt Battery 
Configuration 

Lay the battery box (Horizontally) onto a 

flat surface with the battery label faced up.  
Remove vertical (Left) bus bar and 

associated battery terminal hardware from 

included packaging.  Slide ring terminal of 

Red wire (labeled #1 extending from BMS) 

over end of provided battery terminal bolt, 

and through top hole of vertical bus bar.   

NOTE:

 Proper placement of hardware is in 

the following order - Bolt- head-split lock 

washer-flat washer-ring terminal-bus bar.

 

 

 

Install bolt/ring terminal/bus bar assembly into positive terminal of battery cell #1, and hand 

tighten.  Install remaining terminal bolt into bottom hole of vertical bus bar and into negative 

terminal of battery #3.   
Next, remove from packaging and install horizontal bus bar from negative terminal of battery #1 

to positive terminal of battery #2 (repeat above process to ensure (Red) #2 wire from BMS is 

installed to positive terminal of battery #2). 
Install remaining vertical bus bar from negative terminal of battery #2 to positive terminal of 

battery #4 (repeat above process to ensure (Red) #4 wire from BMS is installed to positive 

terminal of battery #4). 

 

TERMINAL 

 

RIGHT BUS BAR 

LEFT BUS BAR 

TOP BUS BAR 

TERMINAL RED WIRE 1 

TERMINAL RED WIRE 4 

Summary of Contents for Submersible Battery

Page 1: ...ent includes 1 Submersible battery enclosure 1 Submersible battery enclosure entry plate with Battery Management System BMS Wiring 1 Sealing Gasket 2 Foam inserts 40 Stainless Steel 20 x 2 5 partially...

Page 2: ...inch pounds in lbs Use a minimum of 30 inch pounds of torque until you hear an audible click or until the split washer is fully compressed and the bolt is firmly secure Assembly Installation Instructi...

Page 3: ...orientation is positive negative Install Battery cell 1 into top left position of battery box orientation is positive negative TIP Battery box is constructed for tight fit of each cell within box allo...

Page 4: ...ng terminal bus bar Install bolt ring terminal bus bar assembly into positive terminal of battery cell 1 and hand tighten Install remaining terminal bolt into bottom hole of vertical bus bar and into...

Page 5: ...late and Red wire labeled 3 from BMS are placed onto terminal bolt and secured to positive terminal of battery 3 Repeat similar steps to install negative Black wire extending from battery pack entry p...

Page 6: ...itional wire connections orientate all ring terminals towards the middle of the grouped batteries This will allow for proper placement of foam inserts described in the following step Step 7 Install Fo...

Page 7: ...ery pack flange ADVISORY Ensure all wires clear entry plate sealing gasket and battery box flange Failure to prevent pinching of internal wiring may result in severed electrical connection or improper...

Page 8: ...ed torque screwdriver fixed with a 7 16 socket and 7 16 combination wrench Torque specifications for sealing hardware is 30 inch pounds in lbs The recommended torqueing pattern is spiral tightening se...

Page 9: ...e Diagram Once the battery pack has been assembled properly sealed and proper voltage verified no maintenance or periodic servicing is required If you have any questions regarding the battery installa...

Page 10: ...iomark Lithium ION battery Packs Charge Cycle Duration Average charge cycle varies depending on battery condition DO NOT use Biomark provided battery charger on any other battery pack DO NOT use any o...

Page 11: ...ctor switch of charger to ON position LED indicator will display charge status and illuminate Green when charging cycle is complete Once charged replace protective pipe plugs over positive and negativ...

Reviews: