10
BIJUR DELIMON INTERNATIONAL
BA_2018_1_GB_WSE
8.
ASSEMBLY, INSTALLATION AND COMMISSIONING
Assembly must only be performed by qualified specialist personnel. Suitable standard assembly tools must
be used.
Contact our Service department if necessary. Our service technicians or assembly supervisors are available to help with
assembly, training and instruction either on a one-off basis or for longer periods to be settled by daily rate.
Installation position and mounting:
In the 4-litre version, the pump unit is preferably attached to a wall via four mounting holes with Ø 7.5, using hexagon nuts
M6 x 40 and washers. Floor mounting is also possible using the 4 rubber-metal buffers underneath the tank.
In the 12-litre version, the pump unit can only be floor-mounted. There are 4 threaded holes (M8x15) in the feet for this
purpose.
The fixing screws are not included in delivery as standard, and must be ordered separately as accessories.
o
When mounted onto a wall, the pump unit must always be in a vertical installation position,or when floor-mounted, the
motor must always be facing upwards.
o
The unit must be mounted tension-free onto a flat surface.
Positioning the pump unit
When installing the pump unit, it must be ensured that it is positioned as closely and centrally as possible to the connected
lubrication points. In connection with the ZE-E lubricant divider, it must also be ensures that the distance between the pump
unit and the furthest ZE-E divider does not exceed 5 m.
o
The pump unit must be easily accessible for maintenance and inspection purposes.
Assembling the pipelines and tubes:
o
Arrange the tubing such that ventilation is possible (with a slight incline from the pump unit to the dividers).
o
Only ever use clean oils!
o
Dirt particles can cause system failure!
o
Clean conditions must be ensured during assembly.
o
The pipes must be checked for impurities (e.g. chippings) prior to connection to the pump unit
and must be flushed out if necessary.
Commissioning:
The pump unit itself does not require any ventilation, although when used in combination with the ZE-E dividers, the system
will need to be ventilated when the pump unit is re-installed or replaced. The ventilation process is described below.
o
Make sure that all connected pipelines are correctly fitted.
o
Fill the oil tank before commissioning the pump unit or lubrication system!
ATTENTION
ATTENTION