+27
A
Assembly Instructions
Step 7
Step 8
9
B
A
Install and whirl the chimney pipe (B)
clockwise by hand to the pizza oven
body assembly (A) as illustrated.
Place the pellet grid (E) to the
fire box assembly (G) first,
then put into the pizza oven body
assembly (A) as illustrated.
E
G
A