55
Step 30: Sand and Water Table Wall Assembly
Part 3
I:
Place 1 Interlocking Lid Latch on each (1931) Post so the edges shown in fig. 30.8 are flush to the tops of both
(1941) Water Sand Supports then attach with 1 (S6) #12 x 1” Pan Screw per latch. (fig. 30.7)
J:
Slide the Sand and Water Table and Sand and Water Lid in between the (1931) Posts, down onto the
Interlocking Lid Latch until they snap into place. The assembly is in the final position only after the lid clicks into
the rounded tab. (fig. 30.8 and 30.9)
Hardware
Other Parts
Flush both sides
1931
Fig. 30.7
1931
Fig. 30.8
Fig. 30.9
1931
S6
1931
1941
Interlocking Lid Latch
Interlocking Lid
Latch
Rounded Tab
2 x
#12 x 1” Pan Screw
S6
2 x Interlocking Lid Latch
1 x Sand and Water Table
1 x Sand and Water Lid
1 x Sand and Water Table
Accessory Bag
Sand and Water Lid
Note: These edges must
rest flush on top of support
Sand and Water Table
Summary of Contents for F23242
Page 3: ...3 support solowavedesign com ...
Page 4: ...4 support solowavedesign com ...
Page 5: ...5 support solowavedesign com ...
Page 61: ...61 support solowavedesign com NOTES NOTES ...
Page 62: ...62 support solowavedesign com NOTES NOTES ...