- 48 -
INST
ALLA
TION
INSTALLATION
total length of the pipes by:
For the bend of 45° loss
0,5 m
For the bend of 90° loss
1 m
Pluming kit ( Fig. 6.13 )
Co-axial ø 60/100 mm + vertical part ø 60
mm (fl ue outlet).
This kit allows the combustion air to be
sucked up and expel the burnt gases di-
rectly to the outside through a telescopic
co- axial fl ue (450-950 mm).
Fig. 6.13
90° =--- 1 m
45° =--- 0,5 m
90° =--- 0,85 m
45° =--- 0,65 m
ø 60 mm
ø 60/100 mm
In the last section, the fumes are expelled
through a vertical section.
Extensions and elbows can be added to ex-
tend the kit’s length.
Maximum equivalent length “
a+b
” (
Fig.
6.13
) of 15 metres for Activ A 25C - Activ
A 30C and 9 metres for Activ A 35C can be
achieved utilising extensions.
Each additional elbow reduces the overall
acceptable length of the fl ue system as fol-
lows:
45° (60/100 mm) reduce length by 0,5 m.
90° (60/100 mm) reduce length by 1 m.
45° (60 mm) reduce length by 0,65 m.
90° (60 mm) reduce length by 0,85 m.
Electric connection
6.9
Unscrew screws "
•
V
"
and remove the front
panel "
W
" by pulling it and pushing it to-
wards the top so that it is freed from the
top housing Fig. 6.14 .
Fig. 6.14
V
W