BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
Tel.: 02196 720480
Fax.: 02196 7204820
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed
6.
Position new bearing before the wheel bearing housing from behind and insert pull-out bell with
spindle into the wheel bearing housing. Attach the following pull-out parts as described under
Point 4 (Dismantling). Now the mounting procedure can begin.
Caution:
Note the correct positioning of the new bearing in order to avoid any canting.
7.
After the bearing has been pulled in, the rear equipping of the spindle up to the thrust washer is
removed again for the preparation for the wheel hub installation and the spindle is pulled
completely out of the axle beam. Now the wheel hub is pushed before the pull-off bell on the
spindle. Insert spindle again into the wheel bearing housing and attach the rear pull-out parts as
they were. Now the installation of the wheel hub can begin.
Caution:
It is to be ensured that the wheel hub is properly inserted and does not cant.
Finally the rear retaining ring is inserted.
ADAPTER PLATE
The plate without bore serves for the reception of all pressure plates for the employment of a
workshop press. The adapter plate peg is placed in the bore of the pressure plate.
CARE AND MAINTENANCE
Spindle and press-off bolt threads are exposed to high loading.
All screw threads must be clean and lubricated during use.
The spindling and press-off bolt threads should be lubricated with a high performance grease before
every utilization.