background image

Installation and User Guide

SyncEV Charger

 | EVT77G.202205.NH

www.syncev.co.uk

SYNC EV APP

You will now need to inform your customer to download the SYNC EV Application

apps.apple.com/gb/app/sync-ev/id1528884639

play.google.com/store/apps/details?id=syncev.co.uk&hl=en_GB&gl=GB

4

5

6

1.  Once downloaded, please register an account, the chargers 

QR code ID and Pin code can be found on the charge point 

identification label on the EV charger and enclosed on the cover 

 

of the installation and user guide.  

 

NOTE:

 The final step during the sign up process presents you with 

an option to input payment card details for Sync EV future public 

charging network. This is not mandatory and it  

can be skipped by pressing the “X” in the top left corner.

2.  Scan the QR code within the app to register this EV charger  

to the customers account.

3. 

Once scanned, enter the PIN code to confirm set up.

SET UP AND COMMISSIONING 

Summary of Contents for SYNC EV EVT77G

Page 1: ...d screws M25 gland 25mm blanking plug Fixing screw caps Assembly screws IDENTIFICATION LABEL EV Charger Type 2 Tethered 7 4kW EVT77G 3 WARRANTY year Tools needed 4mm Hex bit allen key PZ 2 screwdriver suitable drill bit and fixings INTRODUCTION This guide is intended for use by competent electrical installers to explain basic requirements and options to be considered when installed a SyncEV BG Cha...

Page 2: ...table electrode complete with termination housing and covers where appropriate warning labels should be visible and close to the unconnected SWA protective earth eg inside the charger The earth connection shall be made from the electrode to the charger via copper conductor earth wire of an appropriate CSA for the installation The earth wire shall be installed in conduit where there is a risk of me...

Page 3: ... cable if using bottom cable entry location Ensure 3 pole power connector is fully inserted then clip power connector into the base Ensure 4 pole output connector is fully inserted then tuck into the base on the left side Use included hole template to drill fixing holes Ensure correct polarity when making incoming power connections L E N 5 7 6 8 For dynamic load balancing ensure connections are ma...

Page 4: ...ation to confirm the supply is suitable for the additional load A test to confirm the continuity of the circuit protective conductors A test to confirm the integrity of the circuit insulation resistance A test to confirm the polarity of the installation is correct Where applicable a test to confirm the earth electrode resistance is within acceptable tolerances or An earth loop impedance test A tes...

Page 5: ... then show the full configuration page Scan and select the required WifI SSD and enter the correct password This screen will also allow the configuration of charge mode and if load balancing Power distribution is required For Charge Mode the default is APP which requires a confirmation within the SYNC EV app to start charging this can be changed to a Plug and Charge function which will charge with...

Page 6: ...e ID and Pin code can be found on the charge point identification label on the EV charger and enclosed on the cover of the installation and user guide NOTE The final step during the sign up process presents you with an option to input payment card details for Sync EV future public charging network This is not mandatory and it can be skipped by pressing the X in the top left corner 2 Scan the QR co...

Page 7: ...nted price per kWh Power management and configurations to restrict charge rates from 6A to 32A TROUBLESHOOTING For further information or to refer to our FAQs please visit our website www syncev co uk The status of the EV charger can be identified by referencing the colour shown on the LED indicator SOLID BLUE Standby Charger has power and is connected to the Sync EV network FLASHING GREEN Charger...

Page 8: ...ect is given to BG Electrical as soon as reasonably practicable after becoming apparent and the products then returned to BG Electrical 2 The products have only been operated under normal operating conditions and have only been subject to normal use 3 No work other than normal and proper maintenance has been carried out to the products without BG Electrical s prior written consent 4 The products h...

Reviews: