Installation and User Guide
SyncEV Charger
| EVT77G.202205.NH
www.syncev.co.uk
To remove trim, pry at shown points with a flat tool
We recommend cable is wrapped securely around the charger,
with the gun placed at the top with its rubber cover fitted
Snap front cover trim into place
4mm
2.5 N m
FINAL ELECTRICAL TESTING
To meet the BS7671:2018 (18th edition) requirements for testing
of an electrical installation, the following tests and checks shall be
performed by a competent electrical installer before during and after
a SyncEV BG charger is installed:
•
A visual inspection of the installation including the existing
electrical installation.
• Verification of the characteristics of the electrical supply at
the origin of the installation to confirm the supply is suitable
for the additional load.
• A test to confirm the continuity of the circuit protective conductors.
• A test to confirm the integrity of the circuit insulation resistance.
• A test to confirm the polarity of the installation is correct.
• Where applicable a test to confirm the earth electrode
resistance is within acceptable tolerances.
(or)
•
An earth loop impedance test.
•
A test of the mechanical operation of residual current
devices (RCD’s).
• A test to confirm the operation of residual current devices (RCD’s)
is within stipulated time scales (at the rated current and at five
times the rated current operating current).
•
A test or calculated measurement of the prospective fault current.
• A verification of the functional operation of the EV charger.
An electrical installation certificate must be completed.
Ensure electrical testing is done before EV charger
commissioning and network set up is performed.
9
12
11
10