
G
H
I
L
LIVELLARE COL PIANO STRADALE, LEVEL WITH THE ROAD SURFACE, NIVELER SUR LE PLAN DE LA ROUTE, MIT DER
STRASSENEBENE AUSRICHTEN, NIVELAR CON EL NIVEL DE LA CALZADA
RIEMPIRE DI SABBIA FINO A ~200 MM DAL PIANO STRADALE, FILL WITH SAND TO ~200 MM FROM THE ROAD SURFACE,
REMPLIR AVEC DU SABLE JUSQU’À ~200MM DU PLAN DE LA ROUTE, BIS AUF ~200 MM VON DER STRASSENEBENE
MIT SAND BEFUELLEN, LLENAR DE ARENA HASTA ~200 MM DEL NIVEL DE LA CALZADA
POSARE LA RETE ELETTROSALDATA E RIEMPIRE DI CEMENTO, LAY THE ELECTROWELDED MESH AND FILL WITH CON-
CRETE, POSER LA GRILLE ELECTRO-SOUDÉE ET REMPLIR DE CIMENT, DIE BAUSTAHLMATTE VERLEGEN UND FÜLLEN
SIE MIT ZEMENT, COLOCAR LA REJILLA ELECTROSOLDADA E Y LLENAR CON CEMENTO
COMPLETARE LA PAVIMENTAZIONE, FLOORING COMPLETION, COMPLETER LE SOL, DEN BODENBELAG FERTIGSTEL-
LEN, TERMINAR EL PAVIMENTO
~ 200
6 - STOPPY MBB 219-500.C / STOPPY MBB 219-700.C
D811943_09