background image

INSTALLATION MANUAL

ENGLISH

-   FAF. Fixed fork for boom rest 
-   MOOVI GA. Movable rod for boom rest (Only for MOOVI 50 RMM)
-   MOOVI GAMA. Movable cushioned rod for boom rest (Only for MOOVI 

30/50 RMM).

-   SB.  Skirt already assembled to the boom (Only for MOOVI 30/50 

RMM).

-   Safety edge BIR
-   MOOVI LIGHT. Light kit for booms from 3m to 4.5m 
-   MOOVI LIGHT 1. Light kit for booms from 5m to 6m 
-   MOOVI PCA. Lower or upper boom covering contour
-  ELL 3/5
-  AQG3 - AQG5
-  GTO AQG -GTO ATG
-  ATG3 - ATG5 - ATG6
For further information about installation and use of the accessories, make 
reference to their respective instruction manuals. 

5) FOUNDATION PLATE (Fig.2)
-   Prepare a foundation hole suitable for the particular kind of ground.
-   Layout several raceways for the electric cables to pass through.

-   Position the screws supplied with the CBO mod. base into the 4 fixing 

holes with the thread facing upwards. Weld the 4 screw heads to the 
base and protect the welds with rust preventer. Position the base so 

that it protrudes about 20mm from the floor (fig.2).

-   Fill the hole with concrete, checking the position of the base in both 

directions by means of a level, and let the cement harden.

6) FITTING OF THE ACTUATOR

WARNING! The barrier must be exclusively used for vehicles to  
drive through. Pedestrians must not walk within the operator 

manoeuvring area. An appropriate pedestrian passageway must be 
provided for.
The passageway must be suitably indicated by means of the warning 
signs illustrated in Fig.10.

WARNING: before opening the door, make sure that the spring has 
been unloaded (rod at 43°).
 The door of the box must face the inside of 
the property. When standing in the middle of the passageway, if the box 
is on the left the barrier opens to the left, and if the box is on the right the 
barrier opens to the right. 

The actuator is always supplied for left-hand side fitting.

6.1) Left-hand fitting

-   Fix the operator to the foundation base and secure it by means of nuts 

M12 (fig.4 ref.1). The door of the box must face towards the inside of the 

property.

-  The upper surface of the operator is slightly tilted so as to prevent any 

rain water from being trapped there. Therefore use a side surface to 

check correct positioning by means of a level (fig.2).

-  The installation of the MOOVI PRM antishearing Kit (optional) is easier 

when carried out before fitting the boom to the operator. 

  Make reference to Fig.18 and paragraph 6.4 for correct fitting of the 

MOOVI PRM Kit, then proceed to fit the boom.

-   Fit the boom in its opening position (vertical) as indicated in fig.3, ref.7. 

The operator balancing is pre-calibrated for the nominal boom in the 
opening position (balancing spring stretched).

-  Position the cover closing element (fig.3 ref.10) on the boom, as indi

-

cated in fig. 3. After positioning, drill part 10 and boom using a 2 mm 

bit. Insert the screw supplied.

-  Fix the boom using the bracket (fig.3 ref.4) and the screws and wash

-

ers supplied as standard, then fix the protection cover (fig.3 ref.8) 

and finally the screw cover (fig.3 ref.9). Close the protection cover by 

making the closing element slide over the boom (fig.3 ref.10).

 WARNING! The boom must be positioned so as to have the double 

contour facing down (fig.3 ref.11).

-   Balance the boom as described in relevant paragraph 7.

6.2) Right-hand fitting

Some internal members need to be moved, with reference to fig. 4 and 

the following procedure:
A)  Fix the box to the foundation base and lock it in position using M12 

nuts.

B)  Ensure that the balancing spring is in the opening position (stretched 

spring - fig.5).

C)  Completely slacken the spring stretcher (fig.4/ref. 2) until the screw 

(fig. 4/ref.3) anchoring it to the bottom of the box can be removed.

D)  Remove the bar locking bracket (fig.4/ref.4) and slacken the screw 

(fig. 4/ref.5) by means of a CH19 socket spanner until the lever can 

be rota-ted (fig.4/ref.6).

E)  Rotate the lever (fig.4/ref.6) by 180° and fasten it into the correct posi

-

tion.

F)  Tighten the tie rod (fig. 4/ref.5) blocking the lever (fig.4/ref.6) by means 

of a torque wrench set at about 80 N/m.

G) Bring the release key (fig.6) to the manual operation position and 

manually rotate the lever (fig.4/ref.6) downwards by 90° (fig.7) so as 

to bring the barrier to the right-hand opening position.

H)  Lock the spring stretcher (fig.4/ref.2) into position (fig.4/ref.Dx) with 

the screw and self-locking nut.

I)   Adjust the spring stretcher (fig.4/ref.2) until the spring comes under 

tension.

L)  Refit and partially fix the U bolt (fig.4/ref.4) holding the bar to the actua-

tor in the opening position.

M) The installation of the MOOVI PRM antishearing Kit (optional) is easier 

when carried out before fitting the boom to the operator.

  Make reference to Fig.18 and paragraph 6.4 for correct fitting of the 

MOOVI PRM Kit, then proceed to fit the boom. Fit the boom in its 

opening position (vertical) as indicated in fig.3, ref.7. The operator 

balancing is pre-calibrated for the nominal boom in the opening posi-
tion (balancing spring stretched).

  Position the cover closing element (fig.3 ref.10) on the boom, as indi

-

cated in fig. 3. After positioning, drill part 10 and boom using a 2 mm 

bit. Insert the screw supplied.

  Fix the boom using the bracket (fig.3 ref.4) and the screws and wash

-

ers supplied as standard, then fix the protection cover (fig.3 ref.8) 

and finally the screw cover (fig.3 ref.9). Close the protection cover by 

making the closing element slide over the boom (fig.3 ref.10).

 

WARNING! The boom must be positioned so as to have the double 

contour facing down (fig.3 ref.11).

N)  Carry out bar balancing as described in paragraph 7.
O)  

Invert the limit switch connections and the motor drive connections 

insi-de the control unit (Fig.19), with reference to the instructions regar-
ding the existing control unit. Fig.8 shows a diagram highlighting the 
connections to be inverted.

6.3) Fitting of the metal mass detector device

A DIN bar, which allows the DIN module to be connected, is fitted to the 

versions suitable for the use of a mass detector. For connection, refer 
to the relevant instruction manual. In the case where the bar balancing 
device hinders the adjustment of this device (left-hand barrier), remove it 
from its socket, carry out the adjustment and then reposition it.

6.4) Fitting of MOOVI PRM antishearing Kit (Fig.16)
1)  Remove the rubber plugs.
2)  Join two pivots “P” to antishearing plate “L” so as to obtain a single 

body.

3)  Fix the plate to the box by putting screw M6x20 through the central 

threaded hole in the box.

4)  Fix rotation lock screw M6x10 through the side threaded hole in the 

box.

5)  The antishearing plate is to be positioned on the boom opening, the 

lock screw through the remaining hole. 

6)  During subsequent fitting of the cover, the plate must be inserted 

between two guide pivots “D” fixed by means of screws C. 

  Having completed the fitting procedure, check that the antishearing plate 

operates correctly. When the barrier is lifted, it must be in the position 
indicated in Fig.16, ref.7; when the barrier is being closed, the plate must 
follow the boom movement until it reaches the position indicated in Fig.16, 
ref.8.

6.5) Assembling the flashing light RADIUS B LTA230 R1/ 

RADIUS B LTA 230 R2.(FIG.23)

-   Complete assembly and wiring as directed in instructions provided for 

RADIUS B LTA230 R1/ RADIUS B LTA230 R2.

6.6) Photocell fitting (Fig. 24)

The photocell can be installed on the MOOVI barrier as follows: 

1-  By directly fixing the 

CELLULA 130 photocell to the side of the barrier 

(Fig. 24 “A”)

2-  By fastening the MOOVI 130

 photocell post to one of the front fittings 

(Fig. 24 ”B”)

A) Cellula 130 fitting

1)  Remove the protection cover positioned on the barrier.
2)  Lay the wiring needed for photocell connection.
3)  Fit the photocell as shown in Fig. 24 A by means of the appropriate 

screws.

Refer to the instruction sheet for Cellula 130 for further information.

B) MOOVI 130 post fitting

1)  Remove the protection cover positioned on the barrier.
2)  Lay the wiring needed for photocell connection.

18

 - MOOVI 30S-30RMM-50RMM  Ver. 06

D81

1480_07

Summary of Contents for MOOVI 30S

Page 1: ...E FOR VEHICULAR BARRIERS AUTOMATISME ELECTROMECANIQUE POUR BARRIERE POUR VÉHICULES ELEKTROMECHANISCHER ANTRIEB FÜR FAHRZEUGSCHRANKEN AUTOMATISMOS ELECTROMECANICOS PARA BARRÉRAS VEHICULAR AUTOMATIZAÇÃO ELECTROMECÂNICA PARA BARREIRA VEICULAR 8 027908 283818 ISTRUZIONI D USO E DI INSTALLAZIONE INSTALLATION AND USER S MANUAL INSTRUCTIONS D UTILISATION ET D INSTALLATION INSTALLATIONS UND GEBRAUCHSANLEI...

Page 2: ...2 MOOVI 30S 30RMM 50RMM Ver 06 D811480_07 ...

Page 3: ...s must not walk within the operator manoeuvring area An appropriate pedestrian passageway must be provided for 2 EMERGENCY RELEASE Fig 1 The emergency release allows the bar to be manoeuvred manually It is activated from the outside of the box by inserting the personalised key into the lock placed under the bar and rotating it anticlockwise by 180 WARNING When an actuator without bar needs to be r...

Page 4: ... which might occur during use The installation must comply with the provisions set out by the follow ing European Directives 89 336 CEE 73 23 EEC 98 37 EEC and subsequent amendments Disconnect the electrical power supply before carrying out any work on the installation Also disconnect any buffer batteries if fitted Fit an omnipolar or magnetothermal switch on the mains power supply having a contac...

Page 5: ...n it into the correct posi tion F Tighten the tie rod fig 4 ref 5 blocking the lever fig 4 ref 6 by means of a torque wrench set at about 80 N m G Bring the release key fig 6 to the manual operation position and manually rotate the lever fig 4 ref 6 downwards by 90 fig 7 so as to bring the barrier to the right hand opening position H Lock the spring stretcher fig 4 ref 2 into position fig 4 ref Dx...

Page 6: ...cal installations CEI64 8 IEC364 in conformity with HD384 and other national standards Keep the mains power supply con nections definitely separate from the service connections photocells elec tric edges control devices etc Warning For connection to the mains use a multipolar cable having minimum3x1 5mm2 crosssectionandcomplyingwiththepreviously mentioned regulations for example if the cable is no...

Page 7: ...Alarm time alarm time 30s In the case of obstacle detection or photocell engagement at the end of the time set ranging from 10s to 240s the SCA contact is closed The contact is subsequently opened by the STOP command or by triggering of the closing limit switch Only active when the SCA Alarm logic is set to OFF 4 Zone zone 0 Set the zone number between a minimum value of 0 and a maximum value of 1...

Page 8: ...ween terminals 19 and 20 with barrier lowered contact closed between terminals 18 and 20 with barrier raised 14 SERIAL CONNECTION USING SCS1 BOARD Fig 21 The LEO MV D control panel allows several automation units SCS1 to be connected in a centralised way by means of appropriate serial inputs and outputs This makes it possible to use one single command to open and close all the automation units con...

Page 9: ...by type electrical components copper aluminium plastic etc 21 DISMANTLING WARNING before opening the door make sure that the spring has beenunloaded rodat43 Whentheautomationsystemisdisassembled to be reassembled on another site proceed as follows Disconnect the power supply and the entire electrical installation Remove the actuator from its fixing base Disassemble all the installation components ...

Page 10: ...MOOVI 30S 30RMM 50RMM Ver 06 23 D811480_07 ...

Page 11: ...24 MOOVI 30S 30RMM 50RMM Ver 06 D811480_07 ...

Page 12: ...Fig 3 Fig 1 Fig 2 500 600 400 500 20 350 400 22 cm 38mm 5m Moovi 50 RMM 3m Moovi 30S RMM 6m Moovi 50 RMM ATG 6 32 cm 80 cm 70mm 100 cm 7 10 4 8 9 5 11 6 MOOVI 30S 30RMM 50RMM Ver 06 57 D811480_07 ...

Page 13: ...Fig 7 Fig 5 Fig 6 Fig 4 1 2 6 3 SX DX 80Nm 4 5 58 MOOVI 30S 30RMM 50RMM Ver 06 D811480_07 ...

Page 14: ...MOOVI 30S 30RMM 50RMM Ver 06 59 D811480_07 ...

Page 15: ...Fig 13 Fig 14 2 G C Fig 11 Fig 12 SWC SWO SWC SWO 60 MOOVI 30S 30RMM 50RMM Ver 06 D811480_07 ...

Page 16: ...VI130 MOOVI PCA MOOVI LIGHT PRM 2 3 7 8 P L P D C D C 6 4 SX 2 5 DX 1 2 Left Gauche Links Izquierda Esquerda 1 Right Droite Rechts Derecha Direita GTO ATG GTO AQG ATG 3 ATG 5 ATG 6 ELL 3 5 AQG 3 AQG 5 MOOVI 30S 30RMM 50RMM Ver 06 61 D811480_07 ...

Page 17: ...62 MOOVI 30S 30RMM 50RMM Ver 06 D811480_07 ...

Page 18: ...MOOVI 30S 30RMM 50RMM Ver 06 63 D811480_07 ...

Page 19: ...64 MOOVI 30S 30RMM 50RMM Ver 06 D811480_07 ...

Page 20: ...30 A CELLULA130 B MOOVI130 F G Montaggio lampeggiante Assembling the flashing light Montage du clignotant Montage Blinkleuchte Montaje luz intermitente Montagem da lâmpada cintilante V1 V2 1 2 1 32 4 8 13 5 3 9 25 3 9 V3 5 4 3 V2 V1 V3 4 2 3 V1 V2 MOOVI 30S 30RMM 50RMM Ver 06 65 D811480_07 ...

Page 21: ...3 5 m 3 9 m 4 m 4 2 m 4 3 m 4 4 m 4 7 m 5 m 3 5 m 3 6 m 3 7 m 4 2 m 4 3 m 4 5 m 4 7 m 4 9 m 5 m MOOVI 30 RMM ATG 3 AQG 3 B MIN L 2 5 m 2 6 m 2 6 m 2 9 m 2 7 m 2 8 m 2 9 m 2 7 m 2 8 m 2 9 m 2 9 m MAX L 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m C MIN L 2 9 m 1 7 m 1 7 m 1 8 m 2 1 m 2 1 m 2 2 m 2 3 m 2 4 m 2 5 m 2 7 m 1 9 m 2 m 2 1 m 2 4 m 2 4 m 2 6 m 2 7 m 2 8 m 2 9 m MAX L 3 m 3 m 3 m 3 m 3 m 3 m...

Page 22: ...MOOVI 30S 30RMM 50RMM Ver 06 67 D811480_07 ...

Page 23: ......

Reviews: