
2.2
PREPARATION OF THE COMBUSTION CHAMBER OPENING
(INTO STUDDED WALL)
All combustible parts of the studwork must be set at the distances as shown below
in Fig. 4 & 5.
Refer to Fig. 1 on page three for dimensions of the flue outlet.
8
Minimum 50mm at sides
Minimum 50mm at rear
Combustion Chamber
Fig. 4
Fig. 5
A minimum clearance of
100mm is required above
the top of the flue pipe to
combustible surfaces
Width
= 870
mm
Heigh
t = 95
5mm
Depth = 439mm
NOTE : Dimensions as stated above
include clearance to combustible stud
work