10
The general view of the machine is on page 19 of this booklet.
a b c d e
Fig. 3 - Placing of Product Supply Controls
.
Legend:
a Selection touch-key for one dose of regular coffee.
b Selection touch-key for one dose of weak coffee.
c Selection touch-key for two doses of regular coffee.
d Selection touch-key for two doses of weak coffee.
e Selection touch-key for non-stop supply/programming/stop
Turn on the intercepting water tap.
Set the omnipolar lever switch to ON.
Setting the switch (fig. 4) in position 1 the green light and the red one will light
up.
The water is automatically supplied to the boiler and after 120 seconds the
indicators LED on the keypad will light up; repeat the above operation more than
once, till the pump has completely supplied the boiler and doesn’t start any
longer.
When you reach the minimum water level the red light (fig. 4) will switch off and
setting the switch in position (/VV ) the yellow light (fig. 4) will light up.
CHAPTER 5
USE OF THE MACHINE
5.1 Machine Start and Water Supply