4101-2 Controller Installation Handbook
A-3-2
4.
Also on the
Monitoring Actions
page in the access point
records, the IN Reader should have the name of the OUT
Reader in its
Shunt
field. The OUT Reader should have the
name of the IN Reader in its
Shunt
field.
Global anti-passback
With global anti-passback, the whole site is divided into “zones”, each
zone having a different name. Each door between two zones, for
example zone A and zone B, is controlled by two access points; one
for entry to zone A and exit from zone B; the other for entry to zone B
and exit from zone A.
Wiring
The wiring for each door is exactly the same as for local anti-
passback on the previous page.
Configuring
1.
Door monitoring should be Enabled on both Readers (select
the check box labelled
Enable Door Contact Monitoring
on
the
Monitoring Actions
page in the access point records).
2.
Door Forced and Door Open should be Enabled on one reader
and Disabled on the other reader (it doesn’t matter which way
round). (The check boxes are
Door
Forced Alarm
and
Door
Open Alarm
on the
Monitoring Actions
page in the access
point records.)
3.
Also on the
Monitoring Actions
page in the access point
records, the Reader giving entry to the zone at this access
point should have the name of the reader exiting the zone at
this access point in its
Shunt
field.
4.
Global anti-passback must be Enabled on the
Anti-Passback
page in the System Administration program.
5.
Each zone must have its entry access points and exit access
points configured in the Zone records in the Access
Configuration program.
Refer to the Access Control System Software Handbook HB02/100 for
more details of configuring the Software for anti-passback.
Summary of Contents for 4101-2
Page 2: ......
Page 12: ...4101 2 Controller Installation Handbook viii...
Page 14: ...4101 2 Controller Installation Handbook 1 2...
Page 24: ...4101 2 Controller Installation Handbook 2 10...
Page 46: ...4101 2 Controller Installation Handbook 4 8...
Page 68: ...4101 2 Controller Installation Handbook 7 8...
Page 88: ...4101 2 Controller Installation Handbook 8 20...
Page 110: ...4101 2 Controller Installation Handbook 14 6...
Page 122: ...4101 2 Controller Installation Handbook 16 4...
Page 123: ...Binding posts Earth pin of CONN4 Binding posts...
Page 124: ...0 Connect screen to nearest binding post 1 2 3 04 5 6 7 87 9 3 7 1...
Page 126: ......
Page 127: ...9 9 2 5 6 0 6 7 2 3 5 8 1 7 2 8 1 5...
Page 128: ...3 3 9 3 8 9 3 6 9 6 8 6 9 9 9 4 3 6 9 9 2 5 1 3 6 9 2 5 2 5 8 1 8...
Page 129: ...8 1 8 1 7 2 8 1 5 9 3 3 3 8 1 9 2 3 5 8 1 8 2 9 3 5 3 8 1 9 A 9 3 2 5 2 5 A 8 1 9 9...
Page 131: ...9 6 8 3 6 8 9 A 3 3 9 8 8 3 9 8 9 8 9 6 9 9 9 8 8 6 9...
Page 132: ...8 6 9 4 9 4 0 4 1 8 4 9 9 8 8 9 3 D 3 E 8 8 7 9 9 9...
Page 148: ...4101 2 Controller Installation Handbook 19 16...
Page 154: ...4101 2 Controller Installation Handbook A 1 6...
Page 156: ...4101 2 Controller Installation Handbook A 2 2...