UT340, UT360, UT380, and UT3100
Planning and Installation Manual
7
104
Receiving and Moving the UPS
WARNING!
The UPS and related equipment are very heavy. To prevent personal injury or equipment
damage, use extreme care when handling and transporting the UPS cabinet and related
equipment.
1.
While the UPS system is still on the truck, inspect the equipment and shipping container(s)
for any signs of damage. Do not install the system if damage is apparent. If damage has
occurred, notify BEST as soon as possible.
2.
Compare the shipment with the bill of lading. Report any missing items to the carrier and to
BEST immediately.
3.
Remove the screws on the bottom part of the packaging side plates.
4.
Lift the main package up and off the unit and remove the packing materials from the unit.
5. Check that the label inside the UPS front door corresponds to the system ordered, especially
the input/output voltages.
6. Unbolt the unit from the pallet.
7.
Remove the unit from the pallet with a fork lift.
8.
Use a fork lift or hand truck to transport the unit to the installation site or storage site. Study
the footprint to decide how you will move the UPS through doorways and into position.
9.
Install the separately shipped conduit connection kit. See the conduit connection kit for
installation instructions.