
Installation
7
Axxium
t
Pro 9910 Installation Guide for IBM Applications
S
LTM-1341 A
Uncontrolled Copy
Figure 4. Inserting the Modules
7.
Connect the UPS to utility power.
Models B42 and B46.
Requires the installation of a NEMA-type
14-50 receptacle [single-phase, 4-wire (two hot, a neutral, and a
ground), 200V, 208V or 240V input circuit]. This receptacle
must be located within reach of the model’s input power cord.
The circuit breaker must be within sight of the system or
conform to lock-out, tag-out guidelines (see Table 5).
Table 5. Circuit Breaker Sizing
Model
Input Voltage
Circuit Breaker
B42 and B46
200V, 208V, 240V
50A
B43 and B47
200V, 220V, 230V, 240V
6 kVA: 50A
9 kVA: 70A
Summary of Contents for Axxium Pro 9910
Page 63: ......