User Manual_S7-1200 compressor controller
28
To change the connection between the HMI operator panel and the PLC, use the following
procedure:
•
Close the operating system using the parameter 3 on the screen 2-3.
•
Click on Settings in Start Center.
•
Click on Service & Commissioning in the System group.
•
Select Edit Connections from the list.
•
Wait until the right connection is found in Step 1/3 and continue.
•
In IP Address, enter the address of the PLC and set the Override to ON in Step 2/3
and continue.
•
Confirm the settings by clicking Accept in Step 3/3.
In order to start the operating system, click on Start in Start Center, the example of which is
shown in Fig. 10.
Fig. 10 View of the Start Center of the operator panel firmware.