
28
A
B
C
P
L
H
HN2 TYPE NEUTRALISATION KIT
The HN2 TYPE neutralisation units were designed for sys-
tems equipped with the central heating plant condensate
outlet trap located higher than the boiler condensate outlet.
This neutralisation kits does require electric connections.
Description
Dimensions
L - Width
400
mm
H - Height
220
mm
P - Depth
300
mm
Q.ty of granulate
25
kg
B
1,5 m
max
A
C
P
L
H
Maintenance
Neutralisation device maintenance must be performed at
regular intervals and as required (minimum once per year).
The requirement for maintenance depends on the system
characteristics. For this purpose, the filling level of the dol-
omitic granules must be checked. The minimum filling level
is equal to 15 cm, starting from the upper edge of the box.
The first filling of neutralisation product is sufficient at least
for one heating season in the case of maximum formulation
of condensate.
The operation can be checked easily using the pH indica-
tor cards available commercially. They can be purchased
from any pharmacy or store selling chemical products. The
condensate that exits must have a pH value between 6.5
and 9. If any deposits are found on the surface of the neu-
tralisation device during maintenance, it is recommended
to replace the granulate.
2 11 Electrical connections
Power Plus Box
systems leave the factory completely wired
and the only connections required are the electric power
supply cable, the room thermostats, the outdoor sensor
and the user circulators, using the dedicated terminals.
Proceed as follows:
- switch the boiler OFF at the mains power switch
- open the two front doors in the casing
- loosen the screw (1) and turn the main control panel
(2)
- loosen the screws (3), turn the instrument panel (4).
Insider, there is the low temperature delivery/boiler
sensor and the outdoor sensor (to be connected).