background image

INSTALLER

10

MODELS IDRA N DS 2600

B

 

IDRA N DS

 storage cylinders come in two separate 

packages:

-  The first contains the painted cylinder, protected by 

a plastic bag and 

arranged vertically

 on a wooden 

pallet.

-  The  second  package, 

supplied separately

 and also 

protected by a plastic bag, contains the polyurethane 

insulation with its elegant outer covering, fitting insu-

lation sleeves, top cover, flange cover, identification 

plates and documentation.

The following items are delivered in a plastic bag inside the 

packaging:

-  Instruction manual

-  Bar code labels

-  Hydraulic test certificate

The two magnesium anodes are supplied in a cardboard 

box on the pallet.

Vertical

A

B

H

IDRA N DS

A (mm)

B (mm)

H (mm)

Weight 

(kg)

2600

1300

1300

2525

620

The instruction manual is an integral part of the so-

lar storage cylinder. Once located, read it thoroughly 

and keep it safe.

10  HANDLING

Wear  suitable  personal  protective  equipment  and 

use suitable safety devices.

Make sure that any lifting equipment is of adequate 

capacity to lift and move the storage cylinder.

Do not dispose of packaging material into the envi-

ronment, or leave it within the reach of children, since 

it can become a potential hazard. Dispose of packag-

ing material in compliance with applicable legislation.

MODELS IDRA N DS 1500

Cut the strap (1) located under the insulation at the zips to 

remove the cylinder from the pallet.

1

1

If suitable equipment is not on hand to lift the storage cyl-

inder off the pallet using the eyebolt, proceed as follows.

-  Place a platform of about half the height of the pallet 

near the storage cylinder. Make sure the platform is 

able to support the weight of the storage cylinder

-  Remove the strap (1) then carefully rotate and slide 

the storage cylinder off the pallet on to the platform

-  Make sure that the storage cylinder is perfectly sta-

ble, and then remove the pallet

-  Carefully rotate and slide the storage cylinder off the 

platform on to the floor

-  Remove the platform. Position the storage cylinder as 

required.

Summary of Contents for 20086803

Page 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA N DS Installation and Operation Manual EN...

Page 2: ...2...

Page 3: ...following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises pages...

Page 4: ...acement immediately Keep the product purchase documents to be present ed to the B authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as...

Page 5: ...t 20052790K4LH3800001 Model IDRA N DS 1500 Code 20052790 Serial Number K4LH3800001 Beretta Caldaie Via Risorgimento 13 23900 Lecco LC Italy Capacit nom sanitaria 1449 L 1 8 mq 3 4 mq 1200 L h 2200 L h...

Page 6: ...Sleeve for electric heating element 1 1 2 Coil water capacity 19 4 28 1 28 4 L Coil heat exchange surface area 3 4 4 6 4 6 m2 Power absorbed by coil 88 120 110 kW Domestic hot water production 2200 29...

Page 7: ...ders are equipped with ded icated sockets for the storage cylinder TEMPERATURE GAUGE or TEMPERATURE SENSOR b The installer is responsible for making all necessary connections to the boiler and solar c...

Page 8: ...1 2 F 1 1 4 F Psc1 Diameter length of boiler sensor socket 8 200 mm Psc2 Diameter length of boiler sensor socket 8 200 mm Psr Diameter length of solar controller sensor socket 8 200 mm RE Sleeve for e...

Page 9: ...it safe MODELS IDRA N DS 2000 B IDRA N DS storage cylinders come in two separate packages The first contains the painted cylinder protected by a plastic bag and supported on a wooden pallet The secon...

Page 10: ...equipment and use suitable safety devices b Make sure that any lifting equipment is of adequate capacity to lift and move the storage cylinder a Do not dispose of packaging material into the envi ron...

Page 11: ...storage cylinder from the pallet cut the straps secure the lifting cables to the lifting points on the top of the storage cylinder carefully lift the storage cylinder and position it as re quired 11...

Page 12: ...npack all the material from the second package Wrap the insulation 3 around the storage cylinder carefully lining up the fittings with the holes on the inside of the insulation Secure the insulation i...

Page 13: ...orage cylinder is to be installed 14 INSTALLATION IN OLDER SYSTEMS AND SYSTEMS REQUIRING MODERNISATION When installing B IDRA N DS storage cylinders in old systems or systems requiring modernisation a...

Page 14: ...ake sure that all circuits have been bled Make sure that the boiler and solar collectors con nected to the system shut down correctly when their mains power switches are turned OFF Provided the above...

Page 15: ...e cylinder after cleaning it a Do not use abrasive products petrol or triethylene INTERNAL CLEANING Removing and checking the magnesium anode Remove the cap 1 cover 2 and the anode insula tor disc 1 2...

Page 16: ...functioning Check the pump The water temperature from the boiler is too low Check the temperature setting There is air in the primary circuit Bleed the circuit SOLAR COLLECTOR CIRCUIT FAULT CAUSE SOLU...

Page 17: ...the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the heater tem perature control where available to the minimu...

Page 18: ...END USER 18...

Page 19: ...END USER 19...

Page 20: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefor...

Reviews: