![Bentone BG 700-2 Biogas Installation And Maintenance Instruction Download Page 38](http://html1.mh-extra.com/html/bentone/bg-700-2-biogas/bg-700-2-biogas_installation-and-maintenance-instruction_2735595038.webp)
38
Bentone
A1
Gas burner control
A3
Valve, leak tester, Dungs
VPS504
B1
Ionization electrode
F1
Operating fuse
F2
Operating fuse
F3
Operating fuse
H1
Lamp, low capacity
H2
Lamp, high capacity
K1
Motor contactor with thermal
overload protector
M1
Burner motor
M2
Damper Motor L&S
SQN75.494A21B
R1 UV-detector
S1
Operating switch
S2
Operating switch, stage 2
S3
Control thermostat
S4
Temperature limiter
S5
Micro switch for hinged door
S6
Control thermostat, stage 2
S7
Main switch
S8
Air pressure switch
S9
Gas pressure switch
S10 Gas pressure switch, max
S20 Main switch
T1
Ignition transformer
X1
Connection terminal board
X2
Earth terminal
X3
Plug-in contact, burner
X4
Plug-in contact, boiler
X5
Plug-in contact, stage 2,
burner
X6
Plug-in contact, stage 2,
boiler
X7
Plug-in contact, 3 phase,
burner
X8
Plug-in contact, 3 phase,
boiler
Y1
Gas solenoid valve 1
Y2
Gas solenoid valve 2
Y3
Safety solenoid valve
10.3 List of components
Mains connection and fuse in accordance with local regulations.
Summary of Contents for BG 700-2 Biogas
Page 17: ...17 Bentone 45 Natural gas Propan Biogas UV detektor 4 10 Gas nozzle...
Page 37: ...37 Bentone 10 2 Wiring diagram BP S2...
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...