23
Bentone
172 525 18 2020-10-16
1.
Operation display V1, V2 (optional)
2.
Sealing cap, regulator
3.
Setting cap
4.
Hydraulic brake and setting plate stage 2 V2
5.
Solenoid, 2nd stage V2
6.
Adjustment ring stage 1
7.
Solenoid, 1st stage
8.
Test point connection G 1/8 possible
9.
Test point connection G 1/8 downstream of valve 1,
possible on both sides
10. Outlet flange
11. Test point connection M4 down stream of valve 2
12. Gas flow direction
13. Bypass throttle pilot flame adjustment
14. Vent nozzle, regulator
15. Filter (below cover)
16. Inlet flange
17. Test point connection G 1/8 upstream or filter,
possible on both sides
18. Test point connection G 1/8 possible
19.
20.
21. Electrical connection for valves (DIN EN 175 301-
803 connector).
22. Electrical connection for valves V2
2
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
21
22
1
2
3
4
5
6
7
8
9
10
11
12
13
15
17
18
21
16
22
6. Multi-bloc,
6.1 MB-ZRDLE 405-415....B07
/1
Summary of Contents for BG 450
Page 18: ...18 Bentone 4 10 Gas nozzle 45 Natural gas Propan Biogas UV detector...
Page 36: ...36 Bentone 172 615 77 2020 10 21 2 10 2 Wiring diagram BG450 2 BP S4...
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...