Q7T4-FP71G LCD Monitor Service Guide
Engineering Specification
8
Confidential
(2) Random
5 ~100 Hz, 0 dB/Oct. 0.015
g
2
/Hz
100 ~200 Hz, -6 dB/Oct.
200 Hz, 0.0038 g
2
/Hz
Equivalent to 1.47 Grms, All
primary axis, 20 min per-
orientation, total is 60 min.
(3) Procedure:
Confirmed sample with
appearance and function ready
before testing then compare
with after test record as
brightness, uniformity and
contrast ratio. Perform
random vibration after
sine-wave vibration test.
(2) Unpackaged Vibration
Unpackaged, Non-Operating
Test Spectrum:
20 Hz 0.0185(g2/Hz)
200Hz 0.0185(g2/Hz)
Duration : 5 Minutes
Axis : 3 axis ( Horizontal
and Vertical axis ,Z axis)
√
(3) Drop
Package, Non-Operating
91 cm Height (MP stage)
(1 corner, 3 edges, 6 faces)
√
(4) Shock
Wooden package,
Non-Operating
Waveform: half sine
Faces: 6 sides/ per orientation
3 shocks.
Duration: <3ms
Velocity accelerate: 75g
√
3.6 Electrostatic Discharge Requirements
Item
Condition
Spec
OK N.A
Remark
Electrostatic Discharge
IEC801-2 standard
Contact: 8KV
Air: 15KV
√
3.7 EMC
Item
Condition
Spec
OK N.A
Remark
Electric
Band 1 < 10 V/m
Band 2 < 1 V/m
√
TCO03
Magnetic
Band 1 < 200nT
Band 2 < 25nT
√
FCC part 15J class B
EMI
EN55022 class B
After Mass production under
1dBuv for constant measure.
Besides DNSF and VCCI
class-2 are optional.
√
3.8 Reliability
Item
Condition
Spec
OK N.A
Remark
MTBF Prediction
Refer to MIL-217F
> 60,000 Hours
√
Excluding CCFL
CCFL Life time
At 25±2
℃
, under 7.0mA
50,000 Hours (typ.)
√
See Note-4
Note-4:
CCFL lifetime is determined as the time at which brightness of lamp is 50%. The typical lifetime of
CCFL is on the condition at 7.5mA lamp current.
Summary of Contents for Q7T4-FP71G
Page 9: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 9 Confidential Add FFC...
Page 10: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 10 Confidential Add Tape...
Page 14: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 14 Confidential Add one tape...
Page 16: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 16 Confidential Add one screw...
Page 17: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 17 Confidential Add 5 screw...
Page 19: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 19 Confidential Add 2 screw...
Page 21: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 21 Confidential...
Page 22: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 22 Confidential Add one tape...
Page 24: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 24 Confidential Add 4 screw...
Page 25: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 25 Confidential Add 1 screw...
Page 27: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 27 Confidential Finished...
Page 28: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 28 Confidential...
Page 29: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 29 Confidential...
Page 65: ......