Q7T4-FP71G LCD Monitor Service Guide
Circuit Operation Theory
5
Confidential
#3 Switching element and Isolation power transformer
When the Q601 turns on, energy is stored in the transformer.
During Q601 turn-off period, the stored energy is delivered to the
secondary of transformer. R607, C607 and D601 is a snubber circuit.
R615 is current sense resistor to control output power. (See Fig.4)
Fig. 4
#4 Rectifier and filter
D701 and C703 are to produce DC output. L701 is used to suppress high Frequency switching spikes.
(See Fig.5)
Fig. 5
Summary of Contents for Q7T4-FP71G
Page 9: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 9 Confidential Add FFC...
Page 10: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 10 Confidential Add Tape...
Page 14: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 14 Confidential Add one tape...
Page 16: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 16 Confidential Add one screw...
Page 17: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 17 Confidential Add 5 screw...
Page 19: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 19 Confidential Add 2 screw...
Page 21: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 21 Confidential...
Page 22: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 22 Confidential Add one tape...
Page 24: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 24 Confidential Add 4 screw...
Page 25: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 25 Confidential Add 1 screw...
Page 27: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 27 Confidential Finished...
Page 28: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 28 Confidential...
Page 29: ...Q7T4 FP71G LCD Monitor Service Guide Alignment Procedure 29 Confidential...
Page 65: ......