background image

 

-10- 

 
 

RECOMMENDED WIRE ROUTING WHEN USED AS A  

FREE STANDING UNIT 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

NOTE: THE BLOWER BOX CAN BE MOUNTED ON EITHER SIDE.

 

Summary of Contents for WK400

Page 1: ...must be given to the homeowner Please read the warranty and return the warranty card to initiate coverage We Strongly Recommend The Use Of A Carbon Monoxide Detector When Using Any Product That Consum...

Page 2: ...el oil combinations and add ons wood burning appliances shall not be connected to a venting system serving an appliance vented by another type of fuel Connect the furnace to an approved solid fuel fac...

Page 3: ...a of opening is 1 square foot per 100 000 BTU HR total the combined maximum BTU s of the two furnaces for a WK400A ADD ON Where fans are used in the fuel storage area they should be installed so as no...

Page 4: ...n accordance with page 9 using the controls provided The proper positioning of the controls on the wood unit is shown on page 8 The interconnecting wiring from the primary furnace to the wood furnace...

Page 5: ...have stabilized This will take at least hour Read the two temperatures thus obtained and not the difference TS TR see page 8 This difference should not exceed 85 degrees F 29 C Complete the installati...

Page 6: ...t provided 10 If properly mounted the blower will make contact with foil faced insulation 1 8 all around 11 Use insulation obtained from cutout for blower gasket Do NOT use a manual smoke damper with...

Page 7: ...ls containing salt or chemicals This is extremely dangerous and will void the warranty Burn wood only Fuel storage must conform to local ordinances having jurisdiction CLEANING AND MAINTAINING YOUR WK...

Page 8: ...eplace if necessary 6 Replace the covers in reverse order BLOWER and MOTOR Twice yearly oil the blower motor bearings with 4 drops of 20 SAE oil Twice yearly oil the blower motor bearings with 2 drops...

Page 9: ...TYPICAL ADD ON INSTALLATION...

Page 10: ...9...

Page 11: ...10 RECOMMENDED WIRE ROUTING WHEN USED AS A FREE STANDING UNIT NOTE THE BLOWER BOX CAN BE MOUNTED ON EITHER SIDE...

Page 12: ...11...

Page 13: ...12 Wood Furnace Operating Cycle...

Page 14: ...13 Notes...

Page 15: ...14 Notes...

Page 16: ...15 A division of W R BENJAMIN PRODUCTS LIMITED P O Box 2079 Springhill Nova Scotia Canada B0M 1X0 Phone 902 597 3796 Fax 902 597 3797 E mail info benjaminheating com Web site www benjaminheating com...

Reviews: