15
STEP 8
(Mounting the Hydraulic Power Unit)
1. Attach the Power Unit to the POWERSIDE COLUMN.
install the Vibration Dampener between the Power Unit
and the Power Unit Mounting Plate on the Powerside
Column., using four M8 Hex Bolts and Nuts supplied.
(See Fig 8.1)
2. Fill the reservoir with 10 WT. HYDRAULIC OIL OR
DEXRON TYPE III ATF,
approximately four gallons
.
Make
sure the funnel used to fill the power unit is clean.
Do not connect Power Unit Hydraulic Hose Assembly at
this time.
3. The standard power unit for your lift is 220 volt, 60HZ,
single phase. All wiring must be performed by a certified
electrician only. SEE WIRING INSTRUCTIONS AFFIXED
TO MOTOR FOR PROPER WIRING INSTRUCTIONS.
WARNING!
DO NOT run power unit with no oil. Damage to pump can occur.
The power unit must be kept dry. Damage to power unit caused by water or other liquids
such as detergents, acid etc., is not covered under warranty.
Operate lift only between temperatures of 41 °- 104° F.
Improper electrical hook-up can damage motor and will not be covered under warranty.
Motor can not run on 50HZ without a physical change in motor.
Use a separate breaker for each power unit.
Protect each circuit with time delay fuse or circuit breaker.
For 208-230 volt, single phase, use a 25 amp fuse.
For 208-230 volt, three phase, use a 20 amp fuse.
For 380-440 volt, three phase, use a 15 amp fuse.
DANGER !
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Fig 8.1.
DANGER!
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.