Drawing is a front view of the Cable
Lock Plate (attached to the Cylinder
Mount), looking from the Rear Beam
towards the Front Beam.
Cables are pushed in from the
non-cylinder side of the Lock Plate.
2.
With the Button ends of the Cables secure in the Cable Lock Plate, route the non-button ends of
the Cables to their
required
locations in the Cylinder Sheave Mount Assembly, going first over the
top of the Sheave and then under the Sheave, heading back towards the Cylinder Mount.
3.
For Cables
A
and
B
, before getting to the Cylinder Mount, route them to the Double Sheave on the
Offside Platform side of the Center Crossbeam:
•
Route Cable
A
over the Sheave
closest
to the Center Crossbeam and then down.
•
Route Cable
B
over the Sheave
furthest
from the Center Crossbeam and then over to the
single Sheave near the Rear Beam.
4.
Pull Cables
A
and
B
as far as you can towards their destinations and then put them off to the side.
You cannot do anything more with them until you have the Offside Platform structure assembled.
5.
For Cables
C
and
D
, route them through the open area at the bottom of the Cylinder Mount.
•
If you are installing and raising each beam separately, put Cables
C
and
D
off to the side; you
cannot route them any further until the Center Crossbeam is raised into position.
•
If you are installing and raising all of the beams at the same time, route Cables
C
and
D
first
through the Double Sheave on the Front Beam next to the Cylinder Mount, then through the
Double Sheave near the Offside Crossbeam, then to the appropriate Sheaves on the Offside
Crossbeam, then down. After that, put them off to the side, as you cannot do anything else
with them until you have the Offside Platform structure assembled.
Summary of Contents for PL-6KDT
Page 61: ...PL 6K Series of Parking Lifts 61 P N 5900056 Rev D October 2021 Labels ...
Page 62: ...PL 6K Series of Parking Lifts 62 P N 5900056 Rev D October 2021 ...
Page 63: ...PL 6K Series of Parking Lifts 63 P N 5900056 Rev D October 2021 ...
Page 64: ...PL 6K Series of Parking Lifts 64 P N 5900056 Rev D October 2021 Parts Drawings ...
Page 66: ...PL 6K Series of Parking Lifts 66 P N 5900056 Rev D October 2021 ...
Page 67: ...PL 6K Series of Parking Lifts 67 P N 5900056 Rev D October 2021 ...
Page 69: ...PL 6K Series of Parking Lifts 69 P N 5900056 Rev D October 2021 ...
Page 71: ...PL 6K Series of Parking Lifts 71 P N 5900056 Rev D October 2021 ...
Page 72: ...PL 6K Series of Parking Lifts 72 P N 5900056 Rev D October 2021 ...
Page 73: ...PL 6K Series of Parking Lifts 73 P N 5900056 Rev D October 2021 ...
Page 75: ...PL 6K Series of Parking Lifts 75 P N 5900056 Rev D October 2021 ...
Page 76: ...PL 6K Series of Parking Lifts 76 P N 5900056 Rev D October 2021 ...
Page 77: ...PL 6K Series of Parking Lifts 77 P N 5900056 Rev D October 2021 ...
Page 78: ...PL 6K Series of Parking Lifts 78 P N 5900056 Rev D October 2021 ...
Page 79: ...PL 6K Series of Parking Lifts 79 P N 5900056 Rev D October 2021 ...
Page 80: ...PL 6K Series of Parking Lifts 80 P N 5900056 Rev D October 2021 Maintenance Log ...
Page 81: ...PL 6K Series of Parking Lifts 81 P N 5900056 Rev D October 2021 Maintenance Log ...
Page 82: ...PL 6K Series of Parking Lifts 82 P N 5900056 Rev D October 2021 Maintenance Log ...