![BendPak PL-6000 Installation And Operation Manual Download Page 20](http://html1.mh-extra.com/html/bendpak/pl-6000/pl-6000_installation-and-operation-manual_2732227020.webp)
REQUIRED MONTHLY
MAINTENANCE
1. Check all bolts and pins to insure proper mounting.
2. Visually inspect all safeties for proper operation.
3. Lubricate all rollers with 90 wt. gear oil or equivalent.
4. Lubricate all pivot pins with grease.
5. Inspect all anchor bolts and retighten if necessary.
6. Check frames for squareness and plumb.
7. Inspect lift pads, replace if necessary.
8. Inspect all cutoff switch’s for proper operation.
9. Inspect emergency shutoff switch for proper operation.
1. If a cement anchor bolt becomes loose or any
component of the lift is found to be defective,
DO NOT USE THE LIFT
until repairs are made!
2.
DO NOT USE LIFT
if any component is found to be
defective or worn.
3. Never operate (raise or lower) the lift with any
person or equipment below.
4. Never exceed the rated capacity.
5. Always insure the safety is engaged before
approaching raised vehicle.
6. Never leave the lift in an elevated position unless the
safety is engaged.
7. Do not permit the electric control unit to get wet! Motor
damage caused by dampness is not covered under
8.
ALWAYS STAND CLEAR
of lift when lowering or
raising.
20