HELPFUL TIP
Pay careful attention to the labels on the cabels. Install
Sheaves and Cables in the order shown below.
1. The Cylinder Flange Plate
MUST
be installed with
the Guide Assembly facing down and the Cylinder
Retainer Plate on the outside of the guide. Lug ends of
Cables start at Cylinder. (See Fig. 8.3)
2. Loosely route the Cables around the Sheaves, (refer
to the diagram on page 16), and then install the Sheave
Pin and screw in the Sheave Pin Retaining Screw. (It
may be necessary to loosen the Sheave Pin and move
or adjust the pulleys during Cable installation.)
(See Fig. 8.4)
3. Route the threaded Cable ends through the ends of
each Cross Tube, over the Slack Safety Sheave then to
the top of each Column. Secure using the M22 hex nuts
and flat washers. Tighten each nut until there is at least
one inch of threads protruding through the top of the
nut. The Cables will remain loose until start up and final
Cable adjustments are made. (See Fig. 8.5)
17
DANGER !
Failure to route lifting cables as described may lead to
serious personal injury and/or death to operator or
bystander and/or may cause damage to property.
Fig 8.3
Fig 8.4
Fig 8.5
Fig 8.2
A
B
D
C
Summary of Contents for HDS-14
Page 8: ...8 Assembly View ...
Page 24: ...24 ...
Page 31: ...31 Adapter Plate Required for HD 9 12 14 HDS 14 Adapter Plate Required for HD 9 12 14 HDS 14 ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 47: ...47 ...
Page 53: ...53 ...
Page 54: ...54 This page left intentionally blank ...