15
STEP 7
(Sheave Installation)
1. Inspect Cables to ensure proper lengths. All Cables
should have ID tags showing proper Cable lengths.
2. Review the Cable Routing Diagram below before be-
ginning cable installation. (See Fig. 8.1)
3. In order to install the Cables it is necessary to first
extend the Hydraulic Cylinder. Remove both Cylinder port
plugs then use an air gun or come-along to extend the
Cylinder.
IMPORTANT!
Be careful not to damage the chrome
rod during this step. (See Fig. 7.1)
4. You must reinstall the SHEAVES, AND PINS in the same
order as they are removed.. (See Fig. 7.2 - 7.5)
HELPFUL TIP
Removing and replacing the Sheave Shaft to adjust the
Sheaves during the installation of the Cables will allow for
greater clearance when routing Cable ends.
CAUTION!
Use Caution as the Sheaves can fall and break if dropped.
And be sure to install the locking Screw when adjustments
and installation is complete.
Fig 7.1
DANGER !
DO NOT PROCEED unless visual confirmation
is made of ALL Safety Locks. ALL Locks MUST
be engaged before proceeding. Failure to
comply with these instructions may result in
severe personal injury or death. (See page 13)
Fig. 7.3
Fig 7.2
Fig. 7.5
Fig. 7.4
Summary of Contents for HDS-14
Page 8: ...8 Assembly View ...
Page 24: ...24 ...
Page 31: ...31 Adapter Plate Required for HD 9 12 14 HDS 14 Adapter Plate Required for HD 9 12 14 HDS 14 ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 47: ...47 ...
Page 53: ...53 ...
Page 54: ...54 This page left intentionally blank ...