10
CLEARANCES
HD LIGHT DUTY
1. Lift Location: Use architects plan and Engineers
automatic level (transit) when available to locate lift. The
above shows clearances of a typical bay layout. Lift floor
area should be level.
2. Ceiling or overhead clearance must be 80” plus height
of tallest vehicle.
3. Estimating Column Shim requirements:
In the following section, the terms “highest” and “lowest”
refer to elevation of floor.
A. Mark locations where lift columns will be posi-
tioned in bay.
B. Place target on floor at column positions (NOT
on column base plates) and record readings.
C. Find the highest of the four locations. Find the
difference between the readings at each of the re-
maining three columns and the highest reading.
D. The difference is the estimated amount of shim
thickness needed at each column.
Note: Maximum shim thickness is 1/2” per column using
shims and anchors provided with lift.
If no transit is available, floor slope can be determined by
using a chalk line and level.
APPROACH
Summary of Contents for HD-7ZM
Page 26: ...26 ...
Page 35: ...35 ...
Page 36: ...36 ...
Page 44: ...44 ...
Page 45: ...45 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 ...
Page 49: ...49 ...
Page 50: ...50 ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 MAINTENANCE RECORDS ...
Page 54: ...54 MAINTENANCE RECORDS ...
Page 55: ...55 NOTES ...
Page 56: ...56 ...