![BendPak HD-12-B Installation And Operation Manual Download Page 17](http://html.mh-extra.com/html/bendpak/hd-12-b/hd-12-b_installation-and-operation-manual_2732306017.webp)
2. Install the two 90-degree fittings at the cylinder ports. On the
pipe thread side of the fitting it is recommended to use teflon
tape or pipe sealer. DO NOT USE TEFLON TAPE on the JIC
flared end. (See Fig. 10.3 & 10.4 )
3. Install the two standard bulkhead couplers at the outside of
the POWERSIDE RUNWAY adjacent to the power unit.
Tighten securely. (See Fig. 10.5 )
4. Connect hoses as shown below making sure to pass
through the retaining rings. MAKE SURE HOSES ARE KEPT
CLEAR OF CABLES. (See Fig. 10.6, 10.7 & 10.8 )
Fig. 10.3
Fig. 10.4
Fig. 10.5
Fig. 10.7
Fig. 10.6
Fig. 10.8
17
Summary of Contents for HD-12-B
Page 14: ...14 ...
Page 19: ...19 ...
Page 25: ...OPTIONAL EQUIPMENT INSTALLATION 25 ...
Page 26: ...26 OPTIONAL EQUIPMENT INSTALLATION ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 37: ...37 Main Parts List ...
Page 38: ...38 Runway Parts List ...
Page 39: ...39 Crosstube Parts List ...
Page 42: ...42 ...
Page 43: ...43 OPTIONAL EQUIPMENT ...