3. After routing the cables double-check to make sure all are
properly positioned and remain within the grooves of ALL
sheaves. (See Fig. 8.3 & 8.4.)
STEP 9
( Power Unit Installation )
1. Mount the power unit to the mounting bracket using the
M10 hex bolts and nylon nuts then fill the reservoir with 12
quarts of 10-WT hydraulic oil or Dexron III automatic
transmission fluid. (See Fig. 9.1.)
STEP 10
( Routing Hydraulic Hoses )
1. Install the two 90-degree hydraulic fittings to the POWER
PORT and RETURN PORT of the power unit and connect
the hoses as described below. It will be necessary to
remove the shipping plugs from both ports prior to installing
the fittings. (See Fig. 10.1 & 10.2) (SPX Power Unit shown.
Verify port locations on Power Unit before connecting hoses.)
16
Fig. 9.1
Fig.8.2
Fig. 8.3
Fig. 10.1
Fig. 10.2
Fig. 8.4
Fig. 8.1
Summary of Contents for HD-12-B
Page 14: ...14 ...
Page 19: ...19 ...
Page 25: ...OPTIONAL EQUIPMENT INSTALLATION 25 ...
Page 26: ...26 OPTIONAL EQUIPMENT INSTALLATION ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 37: ...37 Main Parts List ...
Page 38: ...38 Runway Parts List ...
Page 39: ...39 Crosstube Parts List ...
Page 42: ...42 ...
Page 43: ...43 OPTIONAL EQUIPMENT ...