4. Tighten each Nut until there is at least one inch of
threads protruding through the top of the nut. The Cables
will remain loose until start up and final Cable adjust
-
ments are made. (See Fig. 8.4)
5. After routing the Cables double-check to make sure
all are properly positioned and remain within the grooves
of ALL Sheaves. (See Fig. 8.5 - 8.6)
STEP 9
( Power Unit Installation )
1. . Mount the Power Unit, the Flex Tube Mount-
ing Bracket, the Vibration Dampener and the Air Valve
Mounting Bracket to the Power Unit Mounting Bracket us-
ing the M8 hex bolts and nylock nuts then fill the reservoir
with 12 quarts of 10-WT hydraulic oil or Dexron III auto-
matic transmission fluid. . (See Fig. 9.1)
DANGER!
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
DANGER !
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Fig 9.1
Fig 8.4
Fig 8.5
Fig 8.6
Fig 8.3
Summary of Contents for 5595139
Page 8: ...8 Assembly View ...
Page 23: ...23 ...
Page 28: ...28 HD 9 12X 14 Rolling Jack Air Line Kit Installation Part 5174009 REV 01 06 09 ...
Page 29: ...29 Adapter Plate Required for HD 9 12 14 Adapter Plate Required for HD 9 12 14 ...
Page 34: ...34 ...
Page 35: ...35 ...
Page 44: ...44 ...
Page 49: ...49 This page intentionally left blank ...
Page 50: ...50 This page intentionally left blank ...