
26
Bell
fi res
English
Installation instructions
The brickwork or the fi re-resistant sheet construction can now be continued to ceiling
height.
If using other materials, such as stone or heat-resistant plating, you should follow the
supplier’s instructions.
For further positioning instructions: See Paragraph 2.1.4.
Check that all connections are completely gas tight using soapy water or a leak tester.
As a check, allow the fi re to burn briefl y (maximum 1 minute).
Following verifi cation that there are no leaks, fi nish off building in the appliance.
After installation in a new fi replace and/or applying new cement work, the
appliance cannot be used for at least four weeks.
If the existing chimney has a diameter of Ø150 - 200 mm, a fl exible stainless steel
Ø100 mm pipe can be used for the fl ue gas outlet.
If the diameter of the existing chimney is over Ø200 mm, a fl exible stainless steel
Ø150 mm pipe must be used for the combustion air supply.
2.1.2 Fitting into an existing opening larger than the appliance
Place a stainless steel pipe of Ø100 mm or pipes (Ø100 mm-150 mm) into the fl ue for
the connection between the fl ue spigot of the appliance and the chimney and then
position the appliance into the fi replace. The chimney connection can be installed
according to the instructions in paragraph 2.1.4.
2.1.3 Fitting into an existing opening equal to or smaller than the appliance
If the opening in the fi replace is too small for the appliance, it must be enlarged by a
recognised installer in accordance with applicable building regulations.
2.1.4 Positioning instructions
Please follow the installation chronology below when positioning a fi replace:
1.
Positioning of the appliance / Gas supply / Electrical connection:
Place the appliance in the open fi re place and position it by the wall. Install the
appliance using a level. Ensure the gas supply pipe has already been fed through
the designated opening at the rear or on the side. A gas tap must be installed in
the vicinity of the appliance that must remain accessible at all times
U.K./Ireland: the appliance is factory equipped with a gas tap.
Connecting the electric connection to an earthed wall socket.
The wall socket must remain accessible at all times.
Summary of Contents for Smart Bell 70 PF
Page 2: ......
Page 6: ...6 Bell res English Installation instructions...
Page 32: ...32 Bell res English Installation instructions Fire glass Dark Amber Embers E Decorative ash A...
Page 54: ...54 Bell res English Installation instructions 7 DIMENSIONS 7 1 SMART BELL 75 70 Built in Frame...
Page 55: ...55 Bell res English Installation instructions 7 2 SMART BELL 75 70 Classic Frame 35 mm...
Page 56: ...56 Bell res English Installation instructions 7 3 SMART BELL 75 70 Classic Frame 52 mm...
Page 57: ...57 Bell res English Installation instructions 7 4 SMART BELL 75 70 Classic Frame 70 mm...
Page 58: ...58 Bell res English Installation instructions 7 5 SMART BELL 75 70 Deepened Frame...
Page 66: ...66 Bell res English Installation instructions...
Page 67: ......