background image

8

Servicing

GB

MAINTENANCE

The Belle Group Porto Screed is designed to give many years of trouble free operation. It is, however, important that the simple 
regular maintenance listed in this section is carried out. It is recommended that an approved Belle Group dealer carries out all major 
maintenance and repairs. Always use genuine Belle Group replacement parts, the use of spurious parts may void your warranty.
Before any maintenance is carried out on the machine, switch off the engine and disconnect the HT lead from the sparkplug.
Always set the Porto Screed on level ground to ensure any fl uid levels will be correctly read.
Only use recommended oils (see chart below).

Running In Period

When the Porto Screed is fi rst used from new, the engine oil must be changed after the initial running in period (see engine manual 
for full detail). The belt tension should be checked after 4 hours use. If a new belt has been fi tted, it must initially be checked after 30 
minutes of use.

Drive Belt.

Remove the belt guard then check the belt tension by placing light fi nger pressure on the top of the belt, as near central between 
the engine drive and drive pulley. The belt should defl ect by a maximum of 4mm. If the belt tension requires adjustment, loosen the 
four nuts holding the bearings in position. Slide the bearings away from the engine and retighten the four nuts. Once set, check the 
belt tension a second time. Then check the pulley alignment. If the alignment is incorrect, loosen the taperlock bushes and move the 
pulley to suit. Once the pulley is aligned, retighten the taperlock bushes. Finally, replace the belt guard ensuring it is correctly and 
securely fi tted.

 

 Routine Maintenance 

after fi rst  

fi rst month 

3 month 

6 month 

     

 

4 hours 

/ 20 h 

/ 50 h 

/ 100 h   

  Engine Oil  

Check Level 

9

 

 

 

  

    

Change 

  

9

    

 

9

 

  Air Filter 

Check Condition 

  

9

  

 

9

 

     

Clean / Replace 

    

 

9

 

  

  Spark Plug 

Check / Clean 

    

 

 

9

 

 Drive Belt 

Tension 

 

9

 

9

 

  

Oil / Fuel Type & Quantity - Spark Plug Type

 

Oil type 

Quantity 

Fuel Type 

Capacity 

Spark Plug 

Electrode

  

(Litre) 

 

(Litre) 

Type 

Gap 

(mm)

Petrol Honda GX120

 

S.A.E. 10W 30 

0.6 

Unleaded 

2.6 

BM6ES or 

0.7 - 0.8

 

    

BMR6EA

Operating Instructions

GB

•   Take the Porto Screed to where it is required.

•   NEVER leave the engine running whilst transporting or moving the Porto Screed, even if it is only a short distance.
 

Note that the machine is a two man lift operation. Never attempt to carry the machine on your own. Always seek assistance with  

 

lifting and transporting the Porto Screed.

•   Having carried out the checks listed in the ‘pre start’ section and prepared the Porto Screed for use, you may  

 

 

start the engine.

 

The Porto Screed is fi tted with a direct drive system. The machine will vibrate at idle speed. To set the Porto Screed for maximum  

 

vibration, set the throttle to maximum.

•   Set the throttle to maximum and use the control handle to gently pull the Porto Screed.

 

NEVER push the Porto Screed, ALWAYS gently pull the machine. This will ensure that you have a consistent fi nish on the surface.  

 

Never force the machine, always allow it to travel at its own pace.

 

Always make sure that no person or obstruction is in your line of travel. Watch your step to avoid tripping.

 

USE extreme caution and be observant when working in close quarters or congested areas.

• 

  To stop the Porto Screed, follow the ‘Start / Stop Procedure’ section.

 

 

 

 

 

 

 

 

 

 

 

 

 

Hints on Concrete Screeding.

1.   Concrete should be placed approximately 1” higher than the formwork over the whole bay area.
2.   With the engine running the machine will vibrate along the bay with the vibrating unit leading. The Porto Screed can be supplied  
 

with two end handles or rope handles which are attached to the end frames. These are for two man operation of the porto screed.

 

The machine will travel with its own momentum with only a little assistance from the operator.

3.   A surcharge of 1” of concrete should be maintained in front of each beam at all times. Any surcharge over 1” must be shovelled or  
 raked 

away.

4.   If a second pass is required the Porto-Screed should be guided quickly over the slab without stopping to avoid ridges.

Summary of Contents for PORTO SCREED

Page 1: ...1 Spare Parts Book Bruksanvisning Operators Manual Betjene Håndbok GB NO 4 10 16 870 20005 1 ...

Page 2: ...ad de Maquinaria y Niveles armonizados estándares asociados donde sean aplicables Emisión de Ruídos conforme a la Directiva 2000 14 CE Anexo VI para máquinas bajo artículo 12 la mencionada unidad está AV Technology Limited AVTECH House Birdhall Lane Cheadle Heath Stockport Cheshire SK3 OXU GB En La Sede Central de Belle Group existen Archivos Técnicos con contenido referente a Niveles de Ruido O s...

Page 3: ...finns dokumenterad hos Belle Groups huvudkontor i Sheen England Vi Belle Group Sheen UK Sheen Nr Buxton Derbyshire SK17 0EU GB bekrefter med dette at det produktet som står beskrevet i denne erklæringen er kjøpt fra en autorisert Belle Group forhandler innen EØF og at det oppfyller følgende direktiver 98 37 CE dette direktivet er et sammendrag av det opprinnelige maskindirektivet 89 392 EØF Det el...

Page 4: ... 2 Belle Group reserves the right to change machine specification without prior notice or obligation This manual has been written to help you operate and service the Porto Screed safely This manual is intended for dealers and operators of the Porto Screed Foreword The Machine Description section helps you to familiarise yourself with the machine s layout and controls The Environment section gives ...

Page 5: ...Operating Handle 12 Exhaust 13 Clamp Bracket Model Porto Screed A Machine Height mm 440 B Machine Length mm 1040 C Machine Width mm 704 Engine Power Honda Petrol Hp 4 Engine RPM 3600 Machine Weight Kg 49 Vibrator Force KN 3 0 Frequency Hz 80 One Man Operation Centre Handle 3 Axis Vibration Figure m sec2 9 89 Usage Time Mins 38 Two Man Operation End Handles 3 Axis Vibration m sec2 5 34 Usage Time M...

Page 6: ...Safety Before refuelling switch off the engine and allow it to cool When refuelling DO NOT smoke or allow naked flames in the area Spilt fuel must be made safe immediately using sand If fuel is spilt on your clothes change them Store fuel in an approved purpose made container away from heat and ignition sources Health Safety GB Vibration Some vibration from the compaction operation is transmitted ...

Page 7: ...ks Preparing the Porto Screed For Use GB Preparing the Porto Screed for use 1 Extending aluminum beams or fixed length beams can be supplied with the machine A variety of fixed length beams are available Contact the sales department for details The extending beams will extend from 3 25 to 5 2 meters 2 To fit the Porto Screed to the aluminum extending beams first set the beams to the required lengt...

Page 8: ... Spark Plug Type Oil type Quantity Fuel Type Capacity Spark Plug Electrode Litre Litre Type Gap mm Petrol Honda GX120 S A E 10W 30 0 6 Unleaded 2 6 BM6ES or 0 7 0 8 BMR6EA Operating Instructions GB Take the Porto Screed to where it is required NEVER leave the engine running whilst transporting or moving the Porto Screed even if it is only a short distance Note that the machine is a two man lift op...

Page 9: ...amage caused by or as a result of failure to follow assembly operation or user maintenance instructions 2 Alterations additions or repairs carried out by persons other than Belle Group or their recognized agents 3 Transportation or shipment costs to and from Belle Group or their recognized agents for repair or assessment against a warranty claim on any machine 4 Materials and or labor costs to ren...

Page 10: ...å sette opp maskinen før bruk og typen forbruksartikler som er tilgjengelige for maskinen Start og stopprosedyren hjelper deg med å starte og stoppe maskinen Feilsøking hjelper deg hvis du har et problem med maskinen Avsnittet Vedlikehold forklarer generelle vedlikeholds og reparasjonsprosedyrer Avsnittet Garanti forklarer garantidekningen og fremgangsmåten ved eventuelle krav Forklaringer til tek...

Page 11: ...ft KN 3 0 Frekvens Hz 80 Enmannsbruk midtre håndtak 3 aksers vibrasjon m sec2 9 89 Brukstid min 38 Tomannsbruk endehåndtak 3 aksers vibrasjon m sec2 5 34 Brukstid min 132 1 2 3 10 6 4 7 11 12 5 8 9 A C B 1 Gassregulator 2 Strupespjeld 3 Drivstoff PÅ AV 4 Motor PÅ AV 5 Luftfilterhus 6 Drivstofftank 7 Rekylstarterhendel 8 Maskinoljefyller peilestav 9 Motoroljetømming 10 Rembeskytter 11 Styrestang 12...

Page 12: ...lder Helse og sikkerhet NO Vibrasjon Enkelte vibrasjoner fra kompakteringsoperasjonen overføres gjennom håndtaket til operatørens hender Porto Screed fra Belle Group er spesielt utformet for å redusere vibrasjonsnivåene hånd arm Se avsnittet Tekniske data angående vibrasjonsnivåer og brukstider anbefalt maksimal daglig eksponeringstid IKKE overstig maksimale brukstider Personlig verneutstyr Ha på ...

Page 13: ...toffnivå og etterfyll etter behov 5 Se etter drivstoff og oljelekkasjer Klargjøre Porto Screed for bruk NO Klargjøre Porto Screed for bruk 1 Utvidbare aluminiumsstenger eller stenger med fast lengde følger med maskinen Det finnes en rekke stenger med fast lengde Ta kontakt med salgsavdelingen for ytterligere detaljer De utvidbare stengene utvider seg fra 3 25 til 5 2 meter 2 For å feste Porto Scre...

Page 14: ...drivstofftype og mengde tennpluggtype Oljetype Mengde Drivstofftype Kapasitet Tennplugg Elektrodegap Liter Liter type mm Honda bensin GX120 S A E 10W 30 0 6 Blyfri 2 6 BM6ES eller 0 7 0 8 BMR6EA Driftsinstruksjoner NO Ta Porto Screed med deg der du trenger den Du må ALDRI la motoren gå mens du transporterer eller flytter Porto Screed selv om det bare er en kort avstand Maskinen må løftes av to per...

Page 15: ...r lignende skader forårsaket av manglende overholdelse av instruksjonene for montasje drift eller vedlikehold 2 Endringer tillegg eller reparasjoner utført av andre enn personer enn de ansatte i konsernet Belle Group eller firmaer dette har godkjent 3 Transport eller forsendelseskostnader til og fra konsernet Belle Group eller firmaer dette har godkjent for reparasjon eller evaluering mot et garan...

Page 16: ...0 330 Anti vibration Mountings 4 13 149 0 045 Handle Mounting Plate 2 14 8 10006 Nut M10 Nyloc 8 15 4 1005 Washer M10 Form A 8 16 8 14006 Nut M14 Nyloc 2 17 151 0 019 Pivot Bolt 2 18 149 0 081 Belt Guard Spacer 1 19 149 0 083S Centre Handle Assy Orange 1 19 149 0 083G Centre Handle Assy Green 1 19 149 0 083Y Centre Handle Assy Yellow Hewden 1 19 149 0 083Y2 Centre Handle Assy Yellow Eberle Hald 1 ...

Page 17: ...Shaft 1 10 148062 Vibrator Weight 1 11 03 3 001 Grubscrew 3 8 UNF 1 12 06 8 000 Key 1 13 06 8 001 Engine Key 1 14 148078 Vibrator Pulley 1 15 4 1005 Washer M10 Form A 12 16 05 2 003 Washer M10 Shakeproof 4 17 8 10006 Nut M10 Nyloc 2 18 8 10003 Nut M10 2 19 148067 Belt Guard 1 20 02 0 121 Setscrew M10 x 120 2 21 02 0 041 Setscrew M10 x 50 2 22 01 0 622 Dome Nut M10 2 23 02 0 012 Setscrew M6 x 16 1 ...

Page 18: ... Comprise of 1 149 3 019 Tie Bar Assembly 2 2 4 1202 Washer M12 spring 2 3 4 1204 Washer M12 2 4 7 12003 Setscrew M12 x 30 2 5 149 0 070 End Frame WA 2 6 36 2 016 Aluminium Beams 3 25m 4 Not Shown 00 0 049 Bolt M12 x 55 4 4 1204 Washer M12 8 8 12006 Nut M12 Nyloc 4 5 6 1 1 1 2 4 3 ...

Page 19: ...Each End Frame contains 149 0 040 End Frame WA 1 02 0 045 Setscrew M10 x 80 2 8 10003 Nut M10 2 Optional Parts 3 149 0 082S End Handle Orange 2 3 149 0 082G End Handle Green 2 3 149 0 082Y End Handle Yellow Hewden 2 3 149 0 082Y2 End Handle Yellow Eberle Hald 2 3 149 0 082Y3 End Handle Yellow Loxam 2 3 149 0 082R End Handle Red 2 3 149 0 082B End Handle Blue 2 3 149 0 082W End Handle White 2 4 21 ...

Page 20: ...m cn Belle Group Inc 3959 Electric Rd Roanoake Suite 360 VA 24018 USA Tel 1 540 345 5090 Fax 1 540 345 5091 Toll free 866 540 5090 e mail sales bellegroup net Belle Group World Parts Centre Unit 5 Bode Business Park Ball Haye Green Leek Staffordshire ST13 8BW Tel 44 1538 380000 Fax 44 1538 380038 Belle Poland sp z o o 96 200 Rawa Mazowiecka Ul Mszczonowska 36 Polska Tel 48 0 46 8144091 Fax 48 0 46...

Reviews: