GENERAL INFORMATION: A damaged flange
on a bulkhead or frame could be repaired from
the outside in the same way as is a cap or
longeron. However, it is not desirable to have a
section on the outside of the aircraft sticking out
normal to the airstream. Frame flanges are
therefore repaired by applying a strap over the
damage. If the damage to a highly loaded
bulkhead is severe, then treat it like a cap and let
the section stick out in the airstream.
OPTION 1: Patch Plate Repair for Small
Damage.
LIMITATIONS: None – Condition 1.
Inspect after every flight.
PERSONNEL/TIME REQUIRED:
2 Soldiers
2 Hours
MATERIALS/TOOLS REQUIRED:
Repair Strap
Cherry Rivets (item 41, Appx C)
Tape or Skin Patch
PROCEDURAL STEPS:
1. Stop drill all cracks, Figure 4-21.
2. Cover the damage with tape. Be sure to
cover the ends of all cracks.
3. Fabricate a repair strap using thick sheet
metal. The sheet metal should be 2 X thickness
of the original flange material, skin, and stringer.
The strap should be wide enough to cover
damaged area and to allow at least two rows of
rivets on the skin, and a minimum of six rivets in
the undamage portion of damaged stringers. The
strap should be long enough to overlap both
ends of the damaged bulkhead or frame flange
by six rivets on each end. In the areas where
the repair strap will overlap on the damaged
bulkhead flange and stringer, remove rivets and
back drill if the area is accessible. If back drilling
is not feasible, interpitch new rivets between
existing rivets.
4. Rivet the repair strap to the bulkhead or
frame flange and stringer using the same size or
larger rivets. Rivet the strap to the skin using two
rows of rivets around the perimeter using the
same size rivets as in adjacent skin-flange
structure.
5. Record BDAR action taken. When mission is
complete, as soon as practical, repair the
equipment/system using standard maintenance
procedures.
OPTION 2: Combination Repair for Major
Frame or Bulkhead Damage.
LIMITATIONS: None — Condition 1.
Inspect after every flight.
PERSONNEL/TIME REQUIRED:
2 Soldiers
3 Hours
MATERIALS/TOOLS REQUIRED:
Filler Patch
Repair Doubler
Skin Patch
Cherry Rivets (item 41, Appx C)
PROCEDURAL STEPS:
1. Remove sections of the skin and frame or
bulkhead containing the damage. Smooth and
round the cutouts, Figure 4-22.
2. Cut and fit repair doubler for frame or
bulkhead. Cut skin patch allowing overlap for at
least two rows of rivets. Repair patch and
doubler should be the same material and one
gauge thicker than original material.
4-59
Summary of Contents for OH-58 C
Page 8: ......
Page 10: ......
Page 20: ......
Page 32: ......
Page 36: ...TM 55 1520 228 BD ASSESSING BATTLEFIELD DAMAGE Table 2 2 General Assessment Cont 2 4...
Page 37: ...TM 55 1520 228 BD ASSESSING BATTLEFIELD DAMAGE Table 2 2 General Assessment Cont 2 5...
Page 38: ...TM 55 1520 228 BD ASSESSING BATTLEFIELD DAMAGE Table 2 2 General Assessment Cont 2 6...
Page 39: ...Table 2 2 General Assessment Cont TM 55 1520 228 BD ASSESSING BATTLEFIELD DAMAGE 2 7...
Page 40: ...I 2 8 TM 55 1520 228 BD ASSESSING BATTLEFIED DAMAGE Table 2 2 General Assessment Cont...
Page 42: ......
Page 44: ......
Page 46: ...TM 55 1520 228 BD AIRFRAME 4 2 Table 4 1 Aircraft Structure Damage Assessment Prodecures...
Page 47: ...TM 55 1520 228 BD AIRFRAME Figure 4 1 Aircraft Sections 4 3...
Page 50: ...TM 55 1520 228 BD AIRFRAME Figure 4 2 DA Form 2404 4 6...
Page 52: ...TM 55 1520 228 BD AIRFRAME Figure 4 3 Evaluating Damage to Angles Channels and Z Angles 4 8...
Page 53: ...TM 55 1520 228 BD AIRFRAME Figure 4 4 Damaged Cross Section 4 9...
Page 55: ...TM 55 1520 228 BD AIRFRAME Figure 4 6 Measuring Damage in Webs and Panels 4 11...
Page 57: ...TM 55 1520 228 BD AIRFRAME Figure 4 7 Measuring Damage in Honeycomb Sandwich Panels 4 13...
Page 61: ...TM 55 1520 228 BD AIRFRAME Figure 4 8 OH 58 Helicopter 4 17...
Page 63: ...TM 55 1520 228 BD AIRFRAME Figure 4 10 Cockpit 4 19...
Page 64: ...TM 55 1520 228 BD AIRFRAME Figure 4 11 Fuselage Pylon Support Structure Sheet 1 of 5 4 20...
Page 65: ...TM 55 1520 228 BD AIRFRAME Figure 4 11 Fuselage Pylon Support Structure Sheet 2 of 5 4 21...
Page 66: ...TM 55 1520 228 BD AIRFRAME Figure 4 11 Fuselage Pylon Support Structure Sheet 3 of 5 4 22...
Page 68: ...TM 55 1520 228 BD AIRFRAME Figure 4 11 Fuselage Pylon Support Structure Sheet 5 of 5 4 24...
Page 69: ...TM 55 1520 228 BD AIRFRAME Figure 4 12 Upper and Lower Shell Structure 4 25...
Page 70: ...TM 55 1520 228 BD AIRFRAME Figure 4 13 Aft Fuselage Structure 4 26...
Page 71: ...TM 55 1520 228 BD AIRFRAME Figure 4 14 Tail Boom 4 27...
Page 72: ...TM 55 1520 228 BD AIRFRAME Figure 4 15 Cowling and Firewalls 4 28...
Page 94: ...4 50 Table 4 8 Metal Substitution Chart TM 55 1520 228 BD AIRFRAME...
Page 96: ...TM 55 1520 228 BD AIRFRAME Figure 4 16 Typical Former Repair Sheet 1 of 2 4 52...
Page 97: ...TM 55 1520 228 BD AIRFRAME Figure 4 16 Typical Former Repair Sheet 2 of 2 4 53...
Page 100: ...TM 55 1520 228 BD AIRFRAME Figure 4 19 Typical Patch Plate Repair 4 56...
Page 102: ...TM 55 1520 228 BD AIRFRAME Figure 4 20 Expedient Cap Longeron Repair 4 58...
Page 104: ...TM 55 1520 228 BD AIRFRAME Figure 4 21 Repair of Damaged Bulkhead Flange 4 60...
Page 105: ...TM 55 1520 228 BD AIRFRAME Figure 4 22 Typical Combination Repair Sheet 1 of 2 4 61...
Page 106: ...TM 55 1520 228 BD AIRFRAME Figure 4 22 Typical Combination Repair Sheet 2 of 2 4 62...
Page 113: ...TM 55 1520 228 BD AIRFRAME Figure 4 29 Fracture Lacing With Safety Wire 4 69...
Page 117: ...TM 55 1520 228 BD ALIGHTING GEAR Table 5 1 Assessment Procedure Logic 5 3...
Page 119: ...TM 55 1520 228 BD ALIGHTING GEAR Figure 5 3 Skid Repair Figure 5 4 Clamp Repair 5 5...
Page 120: ...TM 55 1520 228 BD ALIGHTING GEAR Figure 5 5 Fabricated Clamp 5 6...
Page 122: ...TM 55 1520 228 BD POWER PLANT Figure 6 1 T63 Series Engine 6 2...
Page 123: ...POWER PLANT Table 6 1 Engine BDAR Assessment Logic 6 3...
Page 127: ...TM 55 1520 228 BD POWER PLANT Figure 6 3 Double Check Valve System Possible Alternatives 6 7...
Page 136: ...TM 55 1520 228 BD ROTORS Table 7 1 Assessment Procedures 7 4...
Page 137: ...TM 55 1520 228 BD ROTORS Figure 7 3 Rotor Blades Damage Sensitive Areas 7 5...
Page 139: ...TM 55 1520 228 BD ROTORS Figure 7 4 Rotor Blade Repair Application of Tape 7 7...
Page 143: ...TM 55 1520 228 BD DRIVE TRAIN SYSTEM 8 3 Figure 8 1 Drive Train System Sheet 2 of 4...
Page 144: ...TM 55 1520 228 BD DRIVE TRAIN SYSTEM Figure 8 1 Drive Train System Sheet 3 of 4 8 4...
Page 145: ...TM 55 1520 228 BD DRIVE TRAIN SYSTEM Figure 8 1 Drive Train System Sheet 4 of 4 8 5...
Page 149: ...TM 55 1520 228 BD DRIVE TRAIN SYSTEM Figure 8 3 Flex Duct Repair Sheet 1 of 2 8 9...
Page 150: ...TM 55 1520 228 BD DRIVE TRAIN SYSTEM Figure 8 3 Flex Duct Repair Sheet 2 of 2 8 10...
Page 156: ...TM 55 1520 228 BD HYDRAULIC Table 9 1 Assessment Logic Figure 9 3 Two Part Fitting 9 4...
Page 157: ...TM 55 1520 228 BD HYDRAULIC Figure 9 4 Four Part Fitting Figure 9 5 Using Tube Cutter 9 5...
Page 170: ......
Page 172: ......
Page 180: ...TM 55 1520 228 BD ELECTRICAL AND AVIONICS SYSTEM Figure 11 2 Crimp Splice 11 8...
Page 192: ...TM 55 1520 228 BD ELECTRICAL AND AVIONICS SYSTEM Figure 11 15 Shielded Cable Repair 11 20...
Page 208: ...TM 55 1520 228 BD ELECTRICAL AND AVIONICS SYSTEM Figure 11 35 Circuit Breakers 11 36...
Page 219: ...TM 55 1520 228 BD ELECTRICAL AND AVIONICS SYSTEM Figure 11 45 Preparation of Coax 11 47...
Page 222: ......
Page 225: ...TM 55 1520 228 BD FUEL SYSTEMS Table 12 1 Fuel System Assessment Procedures 12 3...
Page 227: ...TM 55 1520 228 BD FUEL SYSTEMS Figure 12 2 Emergency Mechanical Clamp Repair 12 5...
Page 232: ......
Page 234: ...Figure 13 1 OH 58 Flight Controls Schematic 13 2 TM 55 1520 228 BD FLIGHT CONTROLS SYSTEM...
Page 237: ...TM 55 1520 228 BD FLIGHT CONTROLS SYSTEM Figure 13 2 Collective Flight Control 13 5...
Page 238: ...TM 55 1520 228 BD FLIGHT CONTROLS SYSTEM Figure 13 3 Cyclic Flight Control 13 6...
Page 239: ...TM 55 1520 228 BD FLIGHT CONTROLS SYSTEM Figure 13 4 Flight Control Actuators 13 7...
Page 248: ...TM 55 1520 228 BD UTILITY SYSTEMS Figure 14 1 Engine De Ice System 14 2...
Page 255: ...TM 55 1520 228 BD ENVIRONMENTAL CONTROL SYSTEM Table 15 1 Assessment Procedures 15 7...
Page 258: ...TM 55 1520 228 BD ENVIRONMENTAL CONTROL SYSTEM Figure 15 6 Bleed Air Line Installation 15 10...
Page 260: ......
Page 262: ......
Page 264: ......
Page 266: ......
Page 284: ......
Page 288: ...TM 55 1520 228 BD APPENDIX F Figure F 1 Intercom System Sheet 1 of 2 F 2...
Page 298: ...TM 55 1520 228 BD APPENDIX F Figure F 6 Direction Finder Set AN ARN 89 Sheet 1 of 2 F 12...
Page 300: ...TM 55 1520 228 BD APPENDIX F Figure F 7 Radio Receiving Set AN ARN 123 V 1 Sheet 1 of 2 F 14...
Page 302: ...TM 55 1520 228 BD APPENDIX F Figure F 8 Radar Altimeter System AN APN 209 Sheet 1 of 2 F 16...
Page 314: ......
Page 324: ......
Page 326: ......
Page 332: ...P I N 0 6 6 6 3 5 0 0 0...