719S 2 Door Switching Unit
PD-008 Iss 6
Installation & Operation Manual
Page 7 of 20
Installation
Initially connect all the equipment to one telephone ONLY. With the power applied, test
the system is fully operational. Connect one telephone at a time and test before
proceeding.