11
10
1
2
3
4
5
6
7
8
se
ct
io
n
11
10
Installation
Mounting the PRO3 KVM Switch
Bracket Installation (F1DA108Qea and F1DA116Qea)
Eight- or 16-Port PRO3 KVM Switches include adjustable mounting brackets
ideal for installation in 19-inch racks. The mounting brackets feature three
adjustment positions to allow you to set the PRO3 KVM Switch’s face flush with
the ends of the rails or to extend the PRO3 KVM Switch past the front of the rails.
Please follow these simple steps to achieve the desired adjustment.
Step 1
Determine how far you would like the PRO3 KVM Switch to protrude from the
rack. Select a bracket-hole scheme.
Step 2
Attach the bracket to the side of your PRO3 KVM Switch using the Phillips
screws provided. (Refer to diagram below.)
Step 3
Mount the PRO3 KVM Switch to the rack-rail assembly. (Refer to diagram below.)
Note:
If this PRO3 KVM Switch will be daisy-chained to another KVM switch, set
the BANK address prior to installing on a rack. Refer to the section in this User
Manual titled “Connecting Multiple PRO3 KVM Switches (Daisy-Chaining)”.
Your PRO3 KVM Switch is now mounted securely into the bracket and you are
ready to connect the console.