22
Installation RED25
Release 01 02/2015
2
Installation
The devices have been developed for practical application in a harsh indus-
trial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Installing and grounding the device
Installing an SFP transceiver (optional)
Connecting the power supply and signal lines
Filling out the inscription label
2.1
Checking the package contents
Proceed as follows:
Check whether the package includes all items named in the section
“Scope of delivery” on page 37
Check the individual parts for transport damage.
2.2
Installing and grounding the device
WARNING
FIRE HAZARD
Install the device in a fire protected enclosure according to EN 60950-1.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Summary of Contents for Hirschmann RED25 Series
Page 40: ......