29
Master Control (ITX-MC)
User Guide
Similarly, you can edit the event’s duration value by clicking on the
Duration
setting in the
Schedule grid. The
Change duration
tool appears and you can change the event’s current
value.
When a master control secondary event is selected in the Schedule Grid or Timeline, the
Event Editor
displays a set of standard and event type specific properties (see
page 29). These properties can be edited and applied to the scheduled event by clicking
the
Store Changes
button.
Fig. 3-3: Event Editor for a master control secondary event.