6
Development Kit for EES20 and EES25
Release 1.0 03/2012
About this Guide
Purpose
This document is a step-by-step guide that covers hardware and
software installation procedures required to set up an EES20 or EES25
Development Kit with factory default settings.
In addition to your Development Kit, make sure you have the following
items available:
►
EES Module
►
PC with Ethernet connection
►
Power supply, 24 VDC
►
Ethernet cable and optionally terminal cable RS-232
►
Java Runtime Environment (JRE) installed on your PC for Running
the WEB interface
Legend
The symbols used in this manual have the following meanings:
►
Listing
□
Work step
■
Subheading