Installation
Tunnel Placement Overview
Note:
The driver and passenger side cleaning heads should face each other with arms angled so that the
cleaning heads are slightly turned toward the entrance of the tunnel.
Note:
The dimensions shown below can vary depending on surrounding equipment locations. It is most
important that the DuoScrubber® is moved through its full range of motion to ensure conveyor
clearance before lagging to the floor.
Tunnel Placement
1) Uncrate the driver and passenger side DuoScrubber® assemblies and inspect for damage.
2) Remove the DuoScrubber® assemblies from the shipping pallets. The bolts used to secure
the assemblies to the pallets during shipping are not needed for installation and can be
discarded.
3) Assuming that there is already a conveyor in place, select the desired location for the
equipment.
DIRECTION
of
TRAVEL
Note:
If there is any damaged equipment, file a claim with the trucking company immediately.
Receiving party is responsible for filing claim with trucking company. Notify your local
distributor or Belanger, Inc. immediately if shipment is determined damaged or incomplete.
Operating Envelope
178
”
64””
13” Conveyor:
145
”
14-
1/2” Conveyor:
146-1/2
”
from the outside edge of one base plate to
the outside edge of the other base plate
13
” Conveyor:
46-
1/2”
14-1/2
” Conveyor:
48”
from the inside edge of the inside guide
rail to the outside edge of the base plate
Note:
In this manual a 13” wide Conveyor is shown in all images. If a 14-1/2” wide Conveyor is installed
at the site be sure to add 1-1/2" to the dimensions to position the driver and passenger side
DuoScrubber® assemblies.