Inspection and maintenance
BEKOMAT® 32U
23
7.
or
remove the screws (8) at the intermediate
adapter (9) and remove the latter from the
service unit by pulling it downwards.
8.
Check whether or not the new service unit (5)
goes with the control unit (1).
(model designation and colour of the arresting
hook (2)).
9.
Installation of the new service unit (5) in reverse
order.
Installation of the control unit on the service unit:
1.
Check whether or not the service unit (5) goes with
the control unit (1) (model designation and colour
of the arresting hook).
2.
Check whether or not the sealing mat (11) and the
contact springs (13) are clean, dry, and free from
impurities.
3.
Introduce the sensor (12) into the sensor tube plate
(14).
4.
Hang the hook (15) of the control unit (1)
in the sensor tube plate (14).
5.
Press the control unit (1) against the service unit
(5) and snap into place.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
• Leak test of the screwed connector
• Check of the electrical connections
• Check of the correct engagement of the control unit
max
8
9
1
15
12
11
13
14
5