3.
In stal ling the se wing unit
3.1
Trans port pro tec tions
Before the installation of the sewing unit all transport protections have
to be removed.
Transport protections of the sewing unit
–
Remove the protective foils 1.
–
Remove the security tapes at the thread reel holder, machine table
etc.
Transport protections of the stacker
–
Remove the security tape 3 from the stacker.
–
Remove the security tape 2 and put the foot pedal down.
4
1
3 2
Summary of Contents for 1225/5
Page 2: ......
Page 46: ...Note 42 ...
Page 48: ...1 4 7 6 3 2 5 8 10 9 11 ...
Page 58: ......
Page 60: ......