4
3
4
Assemble the Base
You will need:
Base (part 9) - includes: Metal Rod - Wheel Axle (part 10) & 2 x Wheels (part 11)
Bottom Pole (part 8 - widest pole with a hole half way down)
Place the base on a solid, flat horizontal surface.
Fix the Bottom Pole (part 8) to the Base (part 9) by sliding the Wheel Axle (part 10) out sideways and sliding back
through. The Axle keeps both wheels and the bottom pole in place (see picture below).
Attach the Base Struts
You will need:
Parts as assembled in Step 3
2 x Base Struts (part 5)
2 x Bolt, Nut & Washers D (M13 x 20mm)
1 x Bolt, Nut & Washers E (M13 x 70mm)
First work out which way round the base struts go - line them up with the holes in the base and the hole in the
centre of bottom pole. The ends will sit flat against the two surfaces. Attach the two Base Struts (part 5) to the
base using two Bolt, Nut and Washers D. You will need to tip the base to do this as the nuts and washers go on the
underside of the base. Once the two ends are fixed to the base, attach the other ends to the bottom pole using
Bolt E (M13 x 70mm).
Now the base is assembled - if possible, place your base where you intend to position your stand and follow the
‘Weighing Down the Base’ instructions on page 2.