B11953AC
xxiii
Introduction
Overview
This manual details the necessary site preparation required before installing the CESI 8000 High
Performance Separation System. Pay careful attention to the specifications and requirements
described in this manual. Accurate and timely preparation allows the Beckman Coulter Field
Service Engineer to install the instrument efficiently upon arrival.
The supplies you must have on hand prior to the installation of the instrument are specified. Also
provided is a list of accessories available.
For your convenience, a
is included to help you prepare for the installation.
This preinstallation manual covers:
•
•
Site Requirements and Specifications
•
•
IMPORTANT
The “Customer Preinstallation and Sign-off Sheet” on the next page must be completed and
sent to your CESI 8000 representative before installation of the CESI 8000 system can begin.
Summary of Contents for CESI 8000
Page 11: ...B11953AC xi Beckman Coulter CESI 8000 Beckman Coulter Beckman Coulter Inc Beckman Coulter...
Page 13: ...B11953AC xiii Beckman Coulter 144557 AB...
Page 15: ...B11953AC xv CESI 8000 WEEE WEEE 2005 8 13 WEEE Beckman Coulter CE CE CESI 8000 EEA...
Page 16: ...B11953AC xvi C Tick CESI 8000 C Tick EMC CSA CESI 8000 CSA NRTL...
Page 22: ...xxii Tables...
Page 34: ...B11953AC 2 8 Site Requirements and Specifications Electrical Requirements...
Page 38: ...B11953AC 3 4 Preparing CESI 8000 for Setup Upon Receiving the CESI 8000 System...
Page 40: ...B11953AC 4 2 CESI 8000 System Training Additional Training...
Page 45: ......