Installation
C5210
13
3 Installation
3.1 Transport and Unpacking
The specified storage conditions must be observed (see chapter
3.1.1 Transport
Despite the robust design of the unit, the components are sensitive to strong vibrations and impacts.
During transport, the Industrial PC should be protected from excessive mechanical stress. Therefore,
please use the original packaging.
Attention
Danger of damage to the unit
If the device is transported in cold weather or is exposed to extreme variations in
temperature, make sure that moisture (condensation) does not form on or inside the
device.
Prior to operation, the unit must be allowed to slowly adjust to room temperature. Should condensation
occur, a delay time of approximately 12 hours must be allowed before the unit is switched on.
3.1.2 Unpacking
Proceed as follows to unpack the unit:
1. Remove packaging.
2. Do not discard the original packaging. Keep it for future relocation.
3. Check the delivery for completeness by comparing it with your order.
4. Please keep the associated paperwork. It contains important information for handling the unit.
5. Check the contents for visible shipping damage.
If you notice any shipping damage or inconsistencies between the contents and your order, you should
notify Beckhoff Service.
Summary of Contents for C5210
Page 2: ......