Table of contents
2
C5210
Installation of the PC into the 19-inch Rack
Preparation of the control cabinet
Beckhoff power supply technology
Pin assignment of the connector for the power supply
Check voltage rating and connect
Switching the Industrial PC on and off
Shutting down and switching off
First switching on and driver installation
Replacing the Battery on the Motherboard
UPS Software Components (optional)
Summary of Contents for C5210
Page 2: ......