Commissioning
After opening the terminal box cover you will find all the connection terminals of the frequency converter
in the connection room.
Power supply connection
L1, L2, L3
Motor winding
connection
U, V, W
PTC thermistor motor
connection T1, T2
External ventilator
connection
(optional) X, Y, Z
Control terminals
Release bridge
PE connection
Installation plug,
field bus interface
Slot for field
bus module
Dip-switch
Block 1 - S1
Dip-switch
Block 2 - S5
Relay
aggregated error message,
aggregated operation message
Rel.1, Rel.2
Terminal
Connection
L1, L2, L3
Mains feeder phase L1, L2, L3
PE
Mains feeder earth line PE
U, V, W
Connection strands motor winding U, V, W
X, Y, Z
Feeder phase external ventilator phase L1, L2, L3 (optional)
Connection terminals of the bottom row of the double-decker terminal block:
Terminal
Connection
(1) +24 V SELV
1)
24 V DC fixed voltage output
(2) Digital 1
Digital input 1
Digital 2
Digital input 2
Digital 3
Digital input 3
(9) GND SELV
Signal earth
(9) GND SELV
Signal earth
(3) 0/2…10 V Analog Out 1
Analogue output 1 voltage output
0/4…20 mA Analog Out 1
Analogue output 1 current output
0/2…10 V Analog Out 2
Analogue output 2 voltage output
0/4…20 mA Analog Out 2
Analogue output 2 current output
(9) GND SELV
Signal earth
1)
SELV:
S
afety
E
xtra
L
ow
v
oltage