"Camel" Liquid Ring Medical Vacuum
Medical Systems
A-12
A.8 Storage
A.8.1 2-6
Months
When the pump is expected to be inoperative for a period of 2-6 months, it is recommended that the pump be
completely drained as described in Section A.4.3. After draining, pour rust preventative into the suction and operate
the pump for a very short time.
A.8.2 6+
Months
When the pump is expected to be inoperative for a period longer than six months, it is recommended that the pump
be completely drained as described in Section A.4.3. After draining, dry the internal parts of the pump by blowing
air though the pump and fill the pump with a descalent fluid through both the suction and discharge ports. Store the
pump in a dry location. Rotate rotor every six months and change descalent fluid with fresh fluid if necessary.
WARNING
If proper storage procedures are not followed, the rotor could freeze in
place due to the formation of scale deposits.