"Camel" Liquid Ring Medical Vacuum
Medical Systems
i
Table of Contents
Safety Precautions
1. Installation
1.1
Uncrating
1.2
Location
1.3
Locations Above Sea Level
1.4
Vibration Control
1.5
Piping
1.6
Electrical
requirements
2.
Preparation for Initial Start-up
2.1 Draining and Flushing
2.2
Preliminary
Inspection
3. General
Operation
3.1 How the Vacuum System Works
3.2 Electrical Control Panel
3.3
Relief
Valve
3.4 Anti-Siphon Valve
3.5
Tank Drain
3.6
Vacuum Check Valve
3.7
Emergency Shutdown / Alarms
4. Start-up and Operating Checks
4.1
Manual
Operation
4.2
Automatic Operation
4.3
Vacuum Switch Set Point Adjustments
5. Trouble
Shooting
6. Maintenance
6.1 Routine Checks
7. Replacement
Parts
8.
Maintenance Record
Appendix A - NASH EC "Delta" Pump Information
Appendix B - NASH MHF Pump Information